Search


Current filters:




Start a new search
Add filters:

Use filters to refine the search results, then click the above search button.


Results 1-10 of 22 (Search time: 0.103 seconds).
Item hits:
Issue DateTitleAuthor(s)
1955-04Field moisture content investigation, October 1945-November 1952 phase. Report 2United States. Army. Office of the Chief of Engineers; U.S. Army Engineer Waterways Experiment Station
1955-06Verification of empirical method of determining slope stability, 1954 dataUnited States. Mississippi River Commission; U.S. Army Engineer Waterways Experiment Station
1955-03Tests of anchors for mass-concrete formsUnited States. Army. Office of the Chief of Engineers; U.S. Army Engineer Waterways Experiment Station
1955-08Trafficability of snow. Report 2, Greenland studies 1954U.S. Army Engineer Waterways Experiment Station
1955-10Theoretical landing mat studies : a Corps of Engineers research and development reportU.S. Army Engineer Waterways Experiment Station
1955-11Tests of vinyl membrane as surfacing for airplane landing facilities : a Corps of Engineers research and development reportU.S. Army Engineer Waterways Experiment Station
1955-05Tests of weighing and recording equipment for concrete batchingUnited States. Army. Office of the Chief of Engineers; U.S. Army Engineer Waterways Experiment Station
1955-10Tests of sanded grouts. Report 2, Influence of sand grading and addition of mineral fines on pumpabilityUnited States. Army. Office of the Chief of Engineers; U.S. Army Engineer Waterways Experiment Station
1955-10Tests of sanded grouts. Report 1, Influence of chemicals and mineral fines on pumpabilityUnited States. Army. Office of the Chief of Engineers; U.S. Army Engineer Waterways Experiment Station
1955-10A study of in-place density determinations for soilsUnited States. Army. Office of the Chief of Engineers; U.S. Army Engineer Waterways Experiment Station