Search


Current filters:


Start a new search
Add filters:

Use filters to refine the search results, then click the above search button.


Results 21-29 of 29 (Search time: 0.741 seconds).
Item hits:
Issue DateTitleAuthor(s)
2014-07Upper Mississippi River System Environmental Management Program Definite Project Report and Integrated Environmental Assessment Project #114844 : Harpers Slough Habitat Rehabilitation and Enhancement Project, Pool 9, Upper Mississippi River, Allamakee County, Iowa and Crawford County, WisconsinUnited States. Army. Corps of Engineers. St. Paul District
2010-08Environmental Assessment : Red Wing Wildlife League Dredged Material Placement Site, Shoreline Reclamation and Bank Stabilization, Pool 4 of the Upper Mississippi River, Goodhue County, MinnesotaUnited States. Army. Corps of Engineers. St. Paul District
2012-07Environmental Assessment : Chippewa River Diversion Approach Channel Bank Stabilization, La qui Parle Flood Control and Water Conservation Project, Chippewa County, MinnesotaUnited States. Army. Corps of Engineers. St. Paul District
2019-07St. Louis Riverfront - Meramec River Basin Ecosystem Restoration : Feasibility Study with Integrated Environmental AssessmentUnited States. Army. Corps of Engineers. St. Louis District
2014-06Upper Mississippi River Restoration Definite Project Report with Integrated Environmental Assessment : Clarence Cannon National Wildlife Refuge Habitat Rehabilitation and Enhancement ProjectUnited States. Army. Corps of Engineers. St. Louis District
2019-01Supplemental Environmental Assessment of Finding No Significant Impact (FONSI) : Lower Wood River Levee System Design Deficiency Corrections, Mississippi River, River Miles 195 - 203, Madison County, IllinoisUnited States. Army. Corps of Engineers. St. Louis District
2018-05Pigs Eye Lake Ramsey County, MN Section 204 : Feasibility Study Report with Integrated Environmental AssessmentUnited States. Army. Corps of Engineers. St. Paul District
2017-07Final Programmatic Environmental Impact Statement : Mouse River Enhanced Flood Protection Project, Ward County, North DakotaUnited States. Army. Corps of Engineers. St. Paul District
2018-02Final Environmental Assessment with Finding of No Significant Impact : Rivers Project Forest Management Pool 26, Mississippi River, Lincoln and St. Charles CountiesUnited States. Army. Corps of Engineers. St. Louis District