Search


Current filters:


Start a new search
Add filters:

Use filters to refine the search results, then click the above search button.


Results 1-10 of 195 (Search time: 0.037 seconds).
Item hits:
Issue DateTitleAuthor(s)
2014-09Final Programmatic Environmental Impact Statement (FPEIS) : Removal and Disposal of Sediment and Restoration of Water Storage at John Redmond Reservoir, KansasUnited States. Army. Corps of Engineers. Tulsa District.
2018-06San Juan Harbor, Puerto Rico : Integrated Feasibility Report and Environmental Assessment : Appendix B, Dredged Material Management Plan Preliminary AssessmentUnited States. Army. Corps of Engineers. Jacksonville District.
2019-09Environmental Assessment : Waukegan Harbor Maintenance Dredging and PlacementUnited States. Army. Corps of Engineers. Chicago District.
2019-08Validation of numerical modeling for flows near draghead in operationJohnston, Morgan M.; Hammack, E. Allen.; Smith, David L.
2019-09Continuing Authorities Program, Section 204, Beneficial Uses of Dredged Material, Cedar Island, Virginia : Final Integrated Feasibility Report/Environmental AssessmentUnited States. Army. Corps of Engineers. Norfolk District.
2018-06Benthic Community Reconnaissance Survey: Port Everglades Navigation Improvements Project: Final ReportDial Cordy and Associates.
2017-08Environmental Assessment for Sunflower Advance Maintenance Dredge Cut on the Tombigbee River, Clark and Washington Counties, AlabamaUnited States. Army. Corps of Engineers. Mobile District.
2013-02Environmental Assessment : Dredged Material Placement, 21st Avenue West Channel Embayment, Duluth, MinnesotaUnited States. Army. Corps of Engineers. Detroit District.
2019-06Strategic placement for beneficial use of dredged materialGailani, Joseph Z.; Brutsche, Katherine E.; Hartman, Michael A.; Godsey, Elizabeth S.; Wang, Ping.
2015-05Biological Evaluation : Continued Use of Multiuser Dredged Material Disposal Sites in Puget Sound and Grays HarborUnited States. Army. Corps of Engineers. Seattle District.