Search


Current filters:



Start a new search
Add filters:

Use filters to refine the search results, then click the above search button.


Results 1-9 of 9 (Search time: 0.139 seconds).
  • previous
  • 1
  • next
Item hits:
Issue DateTitleAuthor(s)
2021-05Finite element analysis of quoin block deterioration and load transfer mechanisms in miter gates : pintle and pintle connectionsDixon, DeAnna L.; Hodo, Wayne D.
2021-06Red River Structure physical model study : bulkhead testingBell, Gary L.; Bryant, Duncan B.
2021-09Acoustic nondestructive testing and measurement of tension for steel reinforcing membersMcInerney, Michael K.; Brenner, Matthew W.; Morefield, Sean W.; Weber, R. (Robert); Carlyle, John M.
2020-05Investigation of materials for Charleroi Lock and Dam Monongahela River Reconstruction ProjectRamsey, Monica A.; Strack, Cody M.
2021-03Empirical analysis of effects of dike systems on channel morphology of the Lower Mississippi RiverMayne, Casey M.; May, David P.; Biedenharn, David S.
2021-05Hydraulic dike effects investigation on the Mississippi River : Natchez to Baton RougeMay, David P.; Biedenharn, David S.; McAlpin, Tate O.; Wamsley, Ty V.
2020-09Investigation of testing materials for the Chickamauga Lock and Dam Reconstruction ProjectRamsey, Monica A.; Johnson, Tyler R.; Reed-Gore, Erin R.
2020-01Incidence of zebra mussel on U.S. Army Corps of Engineers structuresHay, K. James; MacAllister, Irene E.; Wilson, Rebekah C.; Brake, Abigail M.
2021-09Navigation and Ecosystem Sustainability Program : Lock and Dam 22, Fish Passage Improvement Project, Project Implementation Report with Integrated Supplemental Environmental AssessmentUnited States. Army. Corps of Engineers. Rock Island District