Please use this identifier to cite or link to this item: https://hdl.handle.net/11681/48071
Title: Environmental Assessment : Algoma Harbor Breakwater Repair, Algoma, Kewaunee County, Wisconsin
Authors: United States. Army. Corps of Engineers. Chicago District
Keywords: Algoma (Wis.)--Harbors
Breakwaters--Maintenance and repair
Environmental protection
Environmental management
Publisher: United States. Army. Corps of Engineers. Chicago District.
Abstract: The primary purpose of this federal action is to support the navigation functions of Algoma Harbor. The need is to repair the structure and install new sheet pile along approximately 1,102 linear feet of the north pier and 1,530 linear feet of the south breakwater. A concrete cap would also be installed over both structures. Both actions are to maintain operational integrity of the structure. The proposed project would provide a more stable and long-lasting structure, better maintaining safe passage for vessels entering and exiting the port.
Description: Environmental Assessment and Finding of No Significant Impact
Rights: Approved for Public Release; Distribution is Unlimited
URI: https://hdl.handle.net/11681/48071
Appears in Collections:Environmental Documents

Files in This Item:
File Description SizeFormat 
Algoma Harbor Breakwater Repair EA_2023.pdf14.51 MBAdobe PDFThumbnail
View/Open