Please use this identifier to cite or link to this item:
https://hdl.handle.net/11681/48027
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Durbin, Thomas E. | - |
dc.contributor.author | Chalifoux, Alan | - |
dc.creator | Construction Engineering Research Laboratory (U.S.) | - |
dc.date.accessioned | 2023-12-19T15:40:05Z | - |
dc.date.available | 2023-12-19T15:40:05Z | - |
dc.date.issued | 1996-04 | - |
dc.identifier.govdoc | USACERL Special Report 96/57 | - |
dc.identifier.uri | https://hdl.handle.net/11681/48027 | - |
dc.description | Special Report | en_US |
dc.description.abstract | Executive Order (EO) 12902 requires that by 2005 the Federal Government including all U.S. Army installations reduce energy consumption by 30 percent as measured against energy consumption in the baseline year of 1985. To help the Army meet the goals of EO 12902, the U.S. Army Construction Engineering Research Laboratories (USACERL) conceived of the Model Energy Installation Program (MlEIP), a 5-year pilot project to investigate the feasibility of instituting energy efficiency on a basewide scale. As part of MEIP, USACERL surveyed the large boiler plants at Fort Hood, TX, to identify energy conservation opportunities (ECOs). The study found numerous opportunities to save energy. Most opportunities consisted of minor repiping, installation of new ancillary equipment. and installation of new, modulating-type burners. The total estimated cost to install all ECOs and address all safety issues is approximately $968,050. The estimated overall natural gas savings is 25 percent per year, or 85,350x 106 Btu per year. At a natural gas price of $3.93 per 1 x 106 Btu, the net savings are calculated to be $283,425, with an estimated simple payback period of 3.42 years. | en_US |
dc.description.sponsorship | Strategic Environmental Research and Development Program (U.S.) | en_US |
dc.format.extent | 88 pages / 19.09 MB | - |
dc.format.medium | PDF/A | - |
dc.language.iso | en_US | en_US |
dc.publisher | Construction Engineering Research Laboratory (U.S.) | en_US |
dc.relation.ispartofseries | Special Report (Construction Engineering Research Laboratory (U.S.)) ; 96/57 | - |
dc.rights | Approved for Public Release; Distribution is Unlimited | - |
dc.source | This Digital Resource was created from scans of the Print Resource | - |
dc.subject | United States.--Army--Facilities--Heating and ventilation | en_US |
dc.subject | Energy consumption--Texas | en_US |
dc.subject | Fort Hood (Tex.) | en_US |
dc.title | Evaluation of boiler plant energy conservation opportunities at Fort Hood, Texas : a study for the Army model energy installation program | en_US |
dc.type | Report | en_US |
Appears in Collections: | Special Report |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
USA-CERL SR-96-57.pdf | 19.09 MB | Adobe PDF | View/Open |