Please use this identifier to cite or link to this item: https://hdl.handle.net/11681/40982
Full metadata record
DC FieldValueLanguage
dc.contributor.authorUnited States. Army. Corps of Engineers. Savannah District-
dc.date.accessioned2021-06-16T17:29:13Z-
dc.date.available2021-06-16T17:29:13Z-
dc.date.issued2017-06-
dc.identifier.urihttps://hdl.handle.net/11681/40982-
dc.descriptionFeasibility Studyen_US
dc.description.abstractThe joint government of the City of Augusta and Richmond County (Augusta-Richmond County) has requested that the U.S. Army Corps of Engineers (USACE) study the flooding risks in the area drained by Rocky Creek, with particular attention to the populated areas within the Rocky Creek Basin. The purpose of this study is to assess and recommend solutions to flooding risks along the Rocky Creek Basin. The problem is flood risks to residential, public, commercial, and industrial properties and the potential for loss of life. The opportunity is to reduce flood risks to properties and loss of life. The objective is to reduce flood risks within the Rocky Creek Basin downstream of the Rosedale Dam Detention Area. The constraint is avoiding induced flooding upstream.en_US
dc.description.sponsorshipUnited States. Army. Corps of Engineers.en_US
dc.format.extent274 pages / 18.11 MB-
dc.format.mediumPDF-
dc.language.isoen_USen_US
dc.publisherUnited States. Army. Corps of Engineers. Savannah District.en_US
dc.rightsApproved for Public Release; Distribution is Unlimited-
dc.sourceThis Digital Resource was created in Microsoft Word and Adobe Acrobat-
dc.subjectAugusta (Ga.)en_US
dc.subjectFlood controlen_US
dc.subjectEnvironmental managementen_US
dc.subjectEnvironmental protectionen_US
dc.titleAugusta Rocky Creek Georgia Flood Risk Management Section 205 Feasibility Studyen_US
dc.typeReporten_US
Appears in Collections:Environmental Documents

Files in This Item:
File Description SizeFormat 
Augusta RC - Section 205 Feasibility Study_2017.pdf18.11 MBAdobe PDFThumbnail
View/Open