Search


Current filters:

Start a new search
Add filters:

Use filters to refine the search results, then click the above search button.


Results 1-10 of 53 (Search time: 0.024 seconds).
Item hits:
Issue DateTitleAuthor(s)
1984-09Mathematical analyses of landside seepage bermsRepair, Evaluation, Maintenance, and Rehabilitation Research Program (U.S.); Barron, Reginald A.
1994-06Field testing and structural analysis of vertical lift lock gateCommander, Brett C.; Schulz, Jeff X.; Goble, George G.; Chasten, Cameron P.
1987-06Floating debris control : a literature reviewPerham, Roscoe E.
1998-02Evaluation of grouting materials for anchor embedments in hardened concreteRepair, Evaluation, Maintenance, and Rehabilitation Research Program (U.S.); McDonald, Willie E.
1997-08Preliminary 3-D testing of CORE-LOC® as a repair concrete armor unit for dolos-armored breakwater slopesRepair, Evaluation, Maintenance, and Rehabilitation Research Program (U.S.); Turk, George F.; Melby, Jeffrey A.
1987-09Inspection and control of levee underseepage during flood fightsCunny, Robert W.
1989-12Geotechnical aspects of rock erosion in emergency spillway channels. Report 4, Geologic and hydrodynamic controls on the mechanics of knickpoint migrationRepair, Evaluation, Maintenance, and Rehabilitation Research Program (U.S.); May, James H.
1994-09Methods for removal of lead paint from steel structuresCorrosion Control Consultants & Labs, Inc.; Smith, Lloyd M.; Beitelman, Alfred D.
1996-02Abrasion Resistant, Volatile Organic Compound (VOC) Compliant Coatings for Hydraulic StructuresRepair, Evaluation, Maintenance, and Rehabilitation Research Program (U.S.); Beitelman, Alfred D.
1998-04Coastal structure inspection technologies : investigation of multibeam sonars for coastal structure surveysRepair, Evaluation, Maintenance, and Rehabilitation Research Program (U.S.); Prickett, Terri L.