Search


Current filters:



Start a new search
Add filters:

Use filters to refine the search results, then click the above search button.


Results 1-9 of 9 (Search time: 0.007 seconds).
  • previous
  • 1
  • next
Item hits:
Issue DateTitleAuthor(s)
2002-12Risk assessment procedures for innovative navigation projectsBen C. Gerwick, Inc.; United States. Army. Corps of Engineers. New England District; Innovations for Navigation Projects Research Program (U.S.); Tuholski, Neil J.; Gluver, Henrik; Cornell, C. Allin; Gerwick, Ben C.; Patev, Robert C.; Padula, Joseph A., 1955-
2000-11Physical data collection for lock wall deteriorationJaycor; Patev, Robert C.; Mlakar, Paul F.; Bryant, Larry M.
2002-12Risk analysis of design-improvement alternatives to the Lindy Claiborne Boggs Lock and DamBMA Engineering, Inc.; United States. Army. Corps of Engineers. New England District; Innovations for Navigation Projects Research Program (U.S.); Ayyub, Bilal M.; Blair, Andrew Nyakaana; Patev, Robert C.
2003-01Prototype barge impact experiments, Allegheny Lock and Dam 2, Pittsburgh, PennsylvaniaUnited States. Army. Corps of Engineers. Louisville District; United States. Army. Corps of Engineers. Pittsburgh District; Innovations for Navigation Projects Research Program (U.S.); Patev, Robert C.; Barker, Bruce C.; Koestler, Leo V.
2002-12Multiple-criteria decision-making in the design of innovative lock walls for barge impact. phase 2, Implementation of methodologiesUniversity of Virginia. Center for Risk Management of Engineering Systems; United States. Army. Corps of Engineers. New England District; Innovations for Navigation Projects Research Program (U.S.); Tsang, Joshua L.; Lambert, James H.; Patev, Robert C.
2002-12Expert-opinion elicitation for the risk analysis of design-improvement alternatives to the Lindy Claiborne Boggs Lock and DamBMA Engineering, Inc.; United States. Army. Corps of Engineers. New England District; Innovations for Navigation Projects Research Program (U.S.); Ayyub, Bilal M.; Patev, Robert C.; Blair, Andrew Nyakaana
2003-12Full-scale barge impact experiments, Robert C. Byrd Lock and Dam, Gallipolis Ferry, West VirginiaUnited States. Army. Corps of Engineers. New England District; United States. Army. Corps of Engineers. Louisville District; United States. Army. Corps of Engineers. Pittsburgh District; Innovations for Navigation Projects Research Program (U.S.); Patev, Robert C.; Barker, Bruce C.; Koestler, Leo V.
2001-12Multiple-criteria decision-making in the design of innovative lock walls for barge impact; phase 1University of Virginia. Center for Risk Management of Engineering Systems; United States. Army. Corps of Engineers. New England District; Innovations for Navigation Projects Research Program (U.S.); Lambert, James H.; Haimes, Yacov Y.; Tsang, Joshua L.; Jiang, Paul; Patev, Robert C.
2005-05Methodology for risk analysis of dam gates and associated operating equipment using fault tree analysisUnited States. Army. Corps of Engineers. New England District; California State University, Fullerton. Department of Civil and Environmental Engineering; Risk Analysis for Dam Safety Program (U.S.); Patev, Robert C.; Putcha, Chandra S.; Foltz, Stuart D.