Search


Current filters:


Start a new search
Add filters:

Use filters to refine the search results, then click the above search button.


Results 11-20 of 209 (Search time: 0.072 seconds).
Item hits:
Issue DateTitleAuthor(s)
2011-08Evaluation of commercially available herbicide mixes for control of rosette stage yellow starthistle (Centaurea solstitialis L.)Mudge, Christopher R.; Wersal, Ryan Michael, 1979-; Nelson, Linda S.
2011-04Steel-shot method for measuring the density of soilsGartrell, Chad A.; Wakeley, Lillian D.; Freeman, Reed B.; Berney, Ernest S.; Kelley, Julie R.
2011-07Distinguishing purposefully disturbed soil from other anthropogenically and naturally modified soilsBroadfoot, Seth W.
2011-02Estimating the acoustic properties of two kinds of gravel at frequencies between 25 and 200 Hz using an impedance tubeSwenson, George W. (George Warner), 1922-; Onder, Timothy E.; White, Michael J.
2011-10Anticipating climate change impacts on Army installationsCold Regions Research and Engineering Laboratory (U.S.); Lozar, Robert C.; Hiett, Matthew D.; Westervelt, James D.; Weatherly, John W.
2011-12The use of natural pozzolan in concrete as an additive or substitute for cementAl-Chaar, Ghassan K.; Alkadi, Mouin; Yaksic, David A.; Kallemeyn, Lisa A.
2011-03Situk River hydrology following closure of Russell Fiord by Hubbard GlacierDaly, Steven F.; Vuyovich, Carrie M.; Finnegan, David C.
2011-01Designing roads and retaining structures for Nangarhar Province, AfghanistanAffleck, Rosa T.; Sargand, S. M. (Shad M.); Russ, Andrew L.; Momand, Farid; Perez Canals, Michelle C.
2011-03Assessing the accuracy of passive microwave estimates of snow water equivalent in data-scarce regions for use in water resource applications : a case study in the Upper Helmand Watershed, AfghanistanVuyovich, Carrie M.
2011-04Engineering assessment of Big House at Summit Station, Greenland : final reportBarna, Lynette A.; Claffey, Keran J.; Buska, James S.; Mercer, Jennifer L.