Search


Current filters:


Start a new search
Add filters:

Use filters to refine the search results, then click the above search button.


Results 11-20 of 39 (Search time: 0.104 seconds).
Item hits:
Issue DateTitleAuthor(s)
1953-07Verification of bank stabilization modelUnited States. Mississippi River Commission; U.S. Army Engineer Waterways Experiment Station
1959-01Verification of empirical method for determining riverbank stability, 1957 dataUnited States. Mississippi River Commission; U.S. Army Engineer Waterways Experiment Station
1953-09Development of operating technique for and verification of channel-meander modelUnited States. Mississippi River Commission; U.S. Army Engineer Waterways Experiment Station
1952-06Goodrich Landing revetment, Mississippi River field investigationUnited States. Mississippi River Commission; U.S. Army Engineer Waterways Experiment Station
1947-07Geological investigation : Reid Bedford Bank caving areaUnited States. Mississippi River Commission; U.S. Army Engineer Waterways Experiment Station
1954-04Hydrographic and hydraulic investigation of Mississippi River revetments : field investigationsUnited States. Mississippi River Commission; U.S. Army Engineer Waterways Experiment Station
1950-06Hardscrabble Bend, Mississippi River revetted bank failure : soils investigationUnited States. Mississippi River Commission; U.S. Army Engineer Waterways Experiment Station
1947-11Instructions and outline for potamology investigationsUnited States. Mississippi River Commission; U.S. Army Engineer Waterways Experiment Station
1948-06Field investigation of Reid Bedford Bend Revetment, Mississippi RiverUnited States. Mississippi River Commission; U.S. Army Engineer Waterways Experiment Station
1948-06Field investigation of Reid Bedford Bend Revetment, Mississippi River : Appendix A, Soils investigationsUnited States. Mississippi River Commission; U.S. Army Engineer Waterways Experiment Station