Please use this identifier to cite or link to this item: https://hdl.handle.net/11681/48394
Title: Turkey Creek Basin Natural Reach : Supplemental Environmental Assessment II & Finding of No Significant Impact
Authors: United States. Army. Corps of Engineers. Kansas City District
Keywords: Floods
Flood control
Flood risk
Environmental protection
Environmental management
Turkey Creek (Neb. and Kan.)
Wyandotte County (Kan.)
Kansas City (Kan.)
Kansas City (Mo.)
Publisher: United States. Army. Corps of Engineers. Kansas City District
Abstract: The purpose of the proposed action (hereinafter referred to as the “Supplemental Project”) is to address stream instability issues within the Natural Reach of lower Turkey Creek. The Natural Reach is experiencing substantial bed lowering, bank erosion, and widening immediately upstream of the entrance to the Walled Channel. Sources of sedimentation upstream, combined with the Natural Reach, have resulted in accumulation of sediment within the Walled Channel Reach directly downstream. This is causing maintenance and conveyance issues as well as degrading the flood risk management performance of the Project design. Long-term operation, maintenance implications, and adverse effects on the Project performance need to be addressed prior to project turnover to the non-federal sponsors.
Description: Supplemental Environmental Assessment and Finding of No Significant Impact
Rights: Approved for Public Release; Distribution is Unlimited
URI: https://hdl.handle.net/11681/48394
Appears in Collections:Environmental Documents

Files in This Item:
File Description SizeFormat 
Turkey Creek Basin - SEA II and FONSI_2023.pdf8.36 MBAdobe PDFThumbnail
View/Open