dc.contributor.authorUnited States. Army. Corps of Engineers. New England District-
dc.date.accessioned2024-02-07T19:01:11Z-
dc.date.available2024-02-07T19:01:11Z-
dc.date.issued2020-03-
dc.identifier.urihttps://hdl.handle.net/11681/48182-
dc.descriptionDetailed Project Report and Environmental Assessmenten_US
dc.description.abstractThe U.S. Army Corps of Engineers (USACE), in partnership with the Rhode Island Coastal Resources Management Council (CRMC), undertook this feasibility study to evaluate the existing navigation conditions in Point Judith Harbor, Narragansett, Rhode Island. The study was conducted to determine the feasibility of Federal involvement in modifying the existing Federal Navigation Project (FNP) for the benefit of commercial fishing vessels. The study concludes that modifications to the existing project in the form of channel widening and channel extension would improve navigational efficiency and increase safety for the port’s commercial fishing fleet.en_US
dc.description.sponsorshipUnited States. Army. Corps of Engineers.en_US
dc.description.tableofcontentsEXECUTIVE SUMMARY ES-1 1.0 INTRODUCTION 1 1.1 Study Authority 3 1.2 Project Study Costs 3 1.3 Project Location 4 1.4 Scope of the Study 4 1.5 Prior Studies and Improvements 5 1.6 Study Participants and Coordination 6 1.7 Project Sponsor 6 1.8 Environmental Operating Principals 7 1.9 USACE Campaign Plan 7 2.0 PROBLEM IDENTIFICATION 8 2.1 Problems and Needs 8 2.2 Existing Conditions 9 2.3 Without Project Condition 15 2.3.1 Impacts of Climate Change 16 2.4 Planning Objectives and Constraints 16 2.4.1 Planning Objectives 16 2.4.2 Planning Constraints 17 3.0 FORMULATION OF PLANS 18 3.1 Plan Formulation Rationale 18 3.2 Management Measures 19 3.3 Analysis of Alternatives Considered 19 3.3.1 General Consideration and Non-Structural Alternatives 19 3.3.2 Structural Alternatives 20 3.4 Alternatives Considered and Eliminated From Further Analysis 23 3.5 Dredged Material Management Alternatives 25 3.6 Results of Initial Screening of Alternatives 26 3.6.1 System of Accounts 27 4.0 COMPARISON OF DETAILED PLANS 28 4.1 General Comparison 28 4.2 Project Costs 31 4.3 Project Benefits 33 4.4 Comparison Summary 34 5.0 ASSESSMENT AND EVALUATION OF DETAILED PLANS 35 5.1 Environmental Impacts 35 5.2 Economic Impacts 37 6.0 SELECTION OF A PLAN 38 6.1 The Selected Plan 38 6.2 Implementation Responsibilities 40 6.3 Risk Informed Decision-Making 43 6.4 Conclusions 45 7.0 RECOMMENDATION 46 ENVIRONMENTAL ASSESSMENT Including Finding of No Significant Impact, and Clean Water Act Section 404(B)(1) Evaluation APPENDICES A Pertinent Correspondence B Project History C Economic Assessment D Design E Cost Engineering F Real Estate Planning Report G Sediment Sampling and Testing H Essential Fish Habitat Assessment I Air Quality Record of Non-Applicability (RONA) J Dredged Material Placement Suitability Determination-
dc.format.extent401 pages / 41.17 MB-
dc.format.mediumPDF-
dc.language.isoen_USen_US
dc.publisherUnited States. Army. Corps of Engineers. New England District.en_US
dc.rightsApproved for Public Release; Distribution is Unlimited-
dc.source.uriThis Digital Resource was created in Microsoft Word and Adobe Acrobat-
dc.subjectPoint Judith (R.I.)--Harborsen_US
dc.subjectInland navigationen_US
dc.subjectChannels (Hydraulic engineering)en_US
dc.subjectDredgingen_US
dc.subjectEnvironmental managementen_US
dc.subjectEnvironmental protectionen_US
dc.titlePoint Judith Harbor of Refuge and Point Judith Pond, Narragansett, Rhode Island : Section 107 Navigation Improvement Project, Detailed Project Report and Environmental Assessmenten_US
dc.typeReporten_US