Please use this identifier to cite or link to this item:
https://hdl.handle.net/11681/48151
Title: | Final Supplemental Environmental Assessment/Environmental Impact Report : Folsom Dam Safety and Flood Damage Reduction : Prison Staging Area and Stilling Basin Drain |
Authors: | United States. Army. Corps of Engineers. Sacramento District United States. Bureau of Reclamation California. Central Valley Flood Protection Board Sacramento Area Flood Control Agency |
Keywords: | Folsom Dam (Calif.) Hydraulic structures--Maintenance and repair Flood control Environmental management Enviromental protection |
Publisher: | United States. Army. Corps of Engineers. Sacramento District. |
Abstract: | The U.S. Army Corps of Engineers (Corps) and the State of California Central Valley Flood Protection Board (CVFPB) propose to implement design refinements to the project, as analyzed in the Folsom Dam Safety and Flood Damage Reduction, Final Environmental Impact Statement/Environmental Impact Report (2007 FEIS/EIR), issued by the U.S. Bureau of Reclamation (Reclamation) in 2007 (Reclamation 2007). These design refinements include (1) using Folsom State Prison land for staging and operating a concrete batch plant, (2) installing a temporary traffic signal on Folsom Lake Crossing, (3) widening an existing dirt access road, and (4) constructing a drain at the stilling basin. Design and construction details of these design refinements are included in Section 2.2. |
Description: | Environmental Assessment and Environmental Impact Report |
Rights: | Approved for Public Release; Distribution is Unlimited |
URI: | https://hdl.handle.net/11681/48151 |
Appears in Collections: | Environmental Documents |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
Final Supplemental EA-EIR - Folsom Dam Safety and Flood Damage Reduction - 2012.pdf | 40.81 MB | Adobe PDF | View/Open |