Search


Current filters:

Start a new search
Add filters:

Use filters to refine the search results, then click the above search button.


Results 51-60 of 68 (Search time: 0.026 seconds).
Item hits:
Issue DateTitleAuthor(s)
1968-05Project Pre-GONDOLA II, structures instrumentationU.S. Army Engineer Nuclear Cratering Group; Ballard, Robert F.
1969-04Project BUGGY, preshot geologic and engineering properties investigationsU.S. Army Engineer Nuclear Cratering Group; Lutton, R. J.; Hunt, Richard W.; Rowland, R. E.
1969-02Vibro/seismic survey and crater disturbance zone delineation : Pre-GONDOLA I, Fort Peck, MontanaU.S. Army Engineer Nuclear Cratering Group; Casagrande, Dirk R.
1968-05Application of finite element method in determining stability of crater slopes : preliminary reportU.S. Army Engineer Nuclear Cratering Group; Banks, D. C. (Don Charles); Palmerton, John B.
1969-05Evaluation of modified T11, Dow, U.S. Steel, Alcoa T11, and Fenestra landing matsUnited States. Army Materiel Command; Carr, Gordon L.
1969-01Engineering tests of Harvey 1-by-6-ft landing mat with integral end connectorsUnited States. Army Materiel Command; McCormick, Charles T.
1969-01Evaluation of MO-MAT ground cover for use in Army depot open-storage areasUnited States. Army Materiel Command; Green, Hugh L.; Gerard, Charles J.
1969-02Evaluation of Dow Chemical extruded aluminum landing mat (modified MX18-B)United States. Army Materiel Command; Lenzner, Leland R.
1968-10Evaluation of thin steel membranesUnited States. Army Materiel Command; Watkins, James E.
1969-04Analysis of laboratory test data to derive soil constitutive propertiesUnited States. Defense Atomic Support Agency; Jackson, J. G. (John Guy)