Please use this identifier to cite or link to this item:
https://hdl.handle.net/11681/37725
Title: | Section 206 Aquatic Ecosystem Restoration Feasibility Report and Environmental Assessment : Removal of Bloomsbury Dam on the Musconetcong River, Borough of Bloomsbury, Hunterdon County, Township of Greenwich, Warren County, New Jersey |
Authors: | United States. Army. Corps of Engineers. Philadelphia District |
Keywords: | Bloomsbury Dam (N.J.) Musconetcong River (N.J.) Restoration ecology Dam retirement Environmental management Environmental protection |
Publisher: | United States. Army. Corps of Engineers. Philadelphia District. |
Abstract: | The purpose of this study is to determine the environmental benefits/costs of removing the Bloomsbury Dam on the Musconetcong River in an effort to significantly enhance the local aquatic habitat, improve fisheries, and restore the river to natural conditions. The objective is to ensure the implementation of an environmentally, economically, and technically sound design. The study includes identification and evaluation of these plans within identified planning constraints. The study results in the recommendation of single plan that achieves the identified goals in an efficient manner while considering the interests of the sponsor. |
Description: | Feasibility Report and Environmental Assessment |
Rights: | Approved for Public Release; Distribution is Unlimited |
URI: | https://hdl.handle.net/11681/37725 |
Appears in Collections: | Environmental Documents |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
Final_Feasibility_Report_and_EA_Bloomsbury_Dam_April_2013.pdf | 16.74 MB | Adobe PDF | View/Open |