Please use this identifier to cite or link to this item: https://hdl.handle.net/11681/37704
Title: Environmental Assessment : North Coventry Township Streambank Stabilization Project, Section 14 - Emergency Streambank Stabilization, Chester County, Pennsylvania
Authors: United States. Army. Corps of Engineers. Philadelphia District
Keywords: North Coventry (Pa. : Township)
Schuylkill River (Pa.)
Erosion
Environmental management
Environmental control
Publisher: United States. Army. Corps of Engineers. Philadelphia District.
Abstract: The U.S. Army Corps of Engineers (Corps), Philadelphia District, was approached by North Coventry Township concerning an erosion problem along one of their local township roads. The purpose of the project is to protect River Road, a township road threatened by streambank failure. The need for the project is the undermining of the road due to streambank erosion as result of high flow events occurring on the Schuylkill River. The erosion problem at this site was noted in 2006 and has been aggravated by flooding following Hurricane Irene in August 2011 and Tropical Storm Lee in September 2011.
Description: Environmental Assessment and Finding of No Significant Impact
Rights: Approved for Public Release; Distribution is Unlimited
URI: https://hdl.handle.net/11681/37704
Appears in Collections:Environmental Documents

Files in This Item:
File Description SizeFormat 
North Coventry Final Environmental Assessment with Appendices.pdf5.79 MBAdobe PDFThumbnail
View/Open