Please use this identifier to cite or link to this item:
https://hdl.handle.net/11681/25944
Title: | G-3273 Constraint Relaxation/S-356 Field Test and S-357N Revised Operational Strategy: Increment 1 plus (Increment 1.1 and 1.2) |
Authors: | United States. Army. Corps of Engineers. Jacksonville District |
Keywords: | Flood control Environmental protection Hydrology Everglades (Fla.) |
Publisher: | United States. Army. Corps of Engineers. Jacksonville District. |
Abstract: | The Modified Water Delivery Project includes modifications to the C&SF Project to provide a system of water deliveries to Everglades National Park across the full width of the historic SRS flow way and consists of four main components: (1) conveyance and seepage control features to facilitate flow through the system from WCA 3A to WCA 3B and to limit seepage eastward from WCA 3B and ENP; (2) modifications to Tamiami Trail to facilitate flow under the road to SRS; (3) flood mitigation for the developed East Everglades area (also referred to as the 8.5 SMA); and (4) project implementation support, which includes monitoring and operational changes. The MWD GDM and Final EIS (USACE 1992) includes a discussion of the location, capacity, and environmental impacts for the proposed structural modifications, which included structures S-345A, B and C; S-349A, B and C; S-355A and B; S-334 modification, removal of the L-67 Extension Levee and borrow canal filling; and a levee and canal system for flood mitigation in 8.5 SMA. The levee and canal system included two pumping stations, S-356 and S-357. |
URI: | http://hdl.handle.net/11681/25944 |
Appears in Collections: | Environmental Documents |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
Supp NEPA EA Inc 1 Plus FINAL 17_0207.pdf | 5.41 MB | Adobe PDF | View/Open |