Search


Current filters:


Start a new search
Add filters:

Use filters to refine the search results, then click the above search button.


Results 1-10 of 29 (Search time: 0.158 seconds).
Item hits:
Issue DateTitleAuthor(s)
2018-08Upper Mississippi River Restoration Feasibility Report with Integrated Environmental Assessment : Keithsburg Division Habitat Rehabilitation and Enhancement Project, Pool 18, Upper Mississippi River Miles 428.0-431.0, Mercer County, IllinoisUnited States. Army. Corps of Engineers. Rock Island District
2017-06Upper Mississippi River Restoration Feasibility Report with Integrated Environmental Assessment : Beaver Island Habitat Rehabilitation and Enhancement Project, Pool 14, Upper Mississippi River Miles 513.0-517.0, Clinton County, IowaUnited States. Army. Corps of Engineers. Rock Island District
2019-01Des Moines River Basin Master Reservoir Regulation Manual Feasibility Report with Integrated Environmental Assessment : Des Moines River, Saylorville Lake, & Lake Red RockUnited States. Army. Corps of Engineers. Rock Island District
2013-12Illinois River Basin Restoration Section 519 Project Implementation Report With Integrated Environmental Assessment : Starved Rock Pool Critical Restoration ProjectUnited States. Army. Corps of Engineers. Rock Island District
2019-07Cedar Rapids Flood Risk Management Project, Cedar Rapids, Iowa : Environmental AssessmentUnited States. Army. Corps of Engineers. Rock Island District
2011-05Upper Mississippi River System Environmental Management Program Definite Project Report with Integrated Environmental Assessment : Ted Shanks Conservation Area Habitat Rehabilitation and Enhancement Project, Pool 24, Mississippi River, Miles 284.5 Through 288.5, Pike County, MissouriUnited States. Army. Corps of Engineers. St. Louis District
2011-01Cedar River, Cedar Rapids, Iowa : Flood Risk Management Project : Feasibility Study Report with Integrated Environmental AssessmentUnited States. Army. Corps of Engineers. Rock Island District
2013-11Upper Mississippi River System Environmental Management Program Definite Project Report with Integrated Environmental Assessment : Huron Island Habitat Rehabilitation and Enhancement Project, Pool 18, Upper Mississippi River, River Miles 421.2 Through 425.4, Des Moines County, IowaUnited States. Army. Corps of Engineers. Rock Island District
2011-03Upper Mississippi River System Environmental Management Program Definite Project Report with Integrated Environmental Assessment (R-17F) : Rice Lake State Fish and Wildlife Area Habitat Rehabilitation and Enhancement Project, LaGrange Pool, Illinois Waterway, River Miles 132.0 Through 138.0, Fulton County, IllinoisUnited States. Army. Corps of Engineers. Rock Island District
2013-03Upper Mississippi River System Environmental Management Program Definite Project Report with Integrated Environmental Assessment (R-19F) : Pool 12 Overwintering Rehabilitation and Enhancement Project, Pool 12, Mississippi River Miles 563-573, Jo Daviess County, IllinoisUnited States. Army. Corps of Engineers. Rock Island District