Search


Current filters:



Start a new search
Add filters:

Use filters to refine the search results, then click the above search button.


Results 1-9 of 9 (Search time: 0.06 seconds).
  • previous
  • 1
  • next
Item hits:
Issue DateTitleAuthor(s)
2019-04Bass Ponds, Marsh, and Wetland Habitat Rehabilitation and Enhancement Project, Feasibility Report and Integrated Environmental Assessment : Upper Mississippi River Restoration ProgramUnited States. Army. Corps of Engineers. St. Paul District
2013-09Supplemental Environmental Assessment : Design Modifications to the Fargo Moorhead Metropolitan Area Flood Risk Management ProjectUnited States. Army. Corps of Engineers. St. Paul District
2011-11Feasibility Report and Environmental Assessment : Marsh Lake Ecosystem Restoration Project, Minnesota River, Big Stone, Lac qui Parle, and Swift Counties, MinnesotaUnited States. Army. Corps of Engineers. St. Paul District; Minnesota. Department of Natural Resources
2011-06Upper Mississippi River System Environmental Management Program Definite Project Report and Integrated Environmental Assessment Project #114832 : Capoli Slough Habitat Rehabilitation and Enhancement Project, Pool 9, Upper Mississippi River, Crawford County, WisconsinUnited States. Army. Corps of Engineers. St. Paul District
2014-07Upper Mississippi River System Environmental Management Program Definite Project Report and Integrated Environmental Assessment Project #114844 : Harpers Slough Habitat Rehabilitation and Enhancement Project, Pool 9, Upper Mississippi River, Allamakee County, Iowa and Crawford County, WisconsinUnited States. Army. Corps of Engineers. St. Paul District
2010-08Environmental Assessment : Red Wing Wildlife League Dredged Material Placement Site, Shoreline Reclamation and Bank Stabilization, Pool 4 of the Upper Mississippi River, Goodhue County, MinnesotaUnited States. Army. Corps of Engineers. St. Paul District
2012-07Environmental Assessment : Chippewa River Diversion Approach Channel Bank Stabilization, La qui Parle Flood Control and Water Conservation Project, Chippewa County, MinnesotaUnited States. Army. Corps of Engineers. St. Paul District
2018-05Pigs Eye Lake Ramsey County, MN Section 204 : Feasibility Study Report with Integrated Environmental AssessmentUnited States. Army. Corps of Engineers. St. Paul District
2017-07Final Programmatic Environmental Impact Statement : Mouse River Enhanced Flood Protection Project, Ward County, North DakotaUnited States. Army. Corps of Engineers. St. Paul District