Collections in this community

Recent Submissions

  • Foundation investigation, Lock site no.2, proposed Pearl River improvement 

    U.S. Army Engineer Waterways Experiment Station. (U.S. Army Engineer Waterways Experiment Station.Engineer Research and Development Center (U.S.), 1938-12)
    Introduction:This memorandum constitutes a report or an investigation of the foundation of Lock No. 2 of the proposed Pearl River Improvement Survey. The investigation was conducted in the Soil Mechanics Division of the ...
RSS Feeds