Skip navigation
Toggle navigation
Home
Browse
Communities
& Collections
Browse Items by:
Issue Date
Author
Title
Subject
Type
Report
About
About Knowledge Core
Policies
History of ERDC
Contact Us
Help
Help
FAQ
Sign on to:
My Knowledge Core
Edit Profile
ERDC Knowledge Core
Search
Search:
All of Knowledge Core
Bureau of Reclamation
Engineer Research and Development Center (ERDC)
Federally Sponsored Research Programs Reports
Pre - Engineer Research and Development Center (ERDC)
U.S. Army
United States Army Corps of Engineers (USACE)
for
Current filters:
Title
Author
Subject
Date Issued
Has File(s)
Filename
File description
Equals
Contains
ID
Not Equals
Not Contains
Not ID
Title
Author
Subject
Date Issued
Has File(s)
Filename
File description
Equals
Contains
ID
Not Equals
Not Contains
Not ID
Start a new search
Add filters:
Use filters to refine the search results, then click the above search button.
Title
Author
Subject
Date Issued
Has File(s)
Filename
File description
Equals
Contains
ID
Not Equals
Not Contains
Not ID
Results 1-10 of 39 (Search time: 0.234 seconds).
previous
1
2
3
4
next
Item hits:
Issue Date
Title
Author(s)
1940-04
Hydraulic model studies of the control structures for the Denison Dam, Red River
U.S. Army Engineer Waterways Experiment Station.
1941-12
Model study of the spillway for the Denison Dam, Red River
U.S. Army Engineer Waterways Experiment Station.
1941-07
Model study of plans for elimination of shoaling in Richmond (Virginia) Harbor in James River
U.S. Army Engineer Waterways Experiment Station.
1943-01
Model study of spillway for Fort Gibson Dam, Grand River, Oklahoma
U.S. Army Engineer Waterways Experiment Station.
;
United States. Mississippi River Commission.
1940-08
Model study of the spillway for the Santee River Dam
U.S. Army Engineer Waterways Experiment Station.
1943-09
Model study of plans for elimination of shoaling in Absecon Inlet, New Jersey
United States. Mississippi River Commission.
;
U.S. Army Engineer Waterways Experiment Station.
1942-06
Model study of Mill Creek flood-control project, Cincinnati, Ohio
U.S. Army Engineer Waterways Experiment Station
1941-12
Model study of plans for reduction of wave action in Grand Marais Harbor, Minnesota
U.S. Army Engineer Waterways Experiment Station.
1942-12
Model study of regulating sluices for Dale Hollow Dam, Obey River, Tennessee
United States. Mississippi River Commission.
;
U.S. Army Engineer Waterways Experiment Station.
1941-07
Model study of the spillway and stilling basin for the Arkabutla Dam, Coldwater River
U.S. Army Engineer Waterways Experiment Station.
Discover
Author
35
U.S. Army Engineer Waterways Expe...
3
U.S. Army Engineer Waterways Expe...
1
Fenwick, G. B.
1
U.S. Army Engineer Waterways Expe...
1
United States. Mississippi River ...
Subject
11
Spillways
7
Stilling basins
4
Sluices
3
Hydraulic structures
3
Intakes (Hydraulic engineering)
3
Sediment transport
3
Stream channelization
2
Allatoona Lake (Ga.)
2
Arkabutla Dam (Miss.)
2
Dry docks
.
next >
Date issued
9
1941
7
1944
6
1940
6
1942
4
1943
3
1946
2
1945
1
1948
1
1949
Has File(s)
39
true