Search


Current filters:


Start a new search
Add filters:

Use filters to refine the search results, then click the above search button.


Results 1-10 of 22 (Search time: 0.061 seconds).
Item hits:
Issue DateTitleAuthor(s)
1938-08Model study of the outlet structures for the Wappapello DamU.S. Army Engineer Waterways Experiment Station.
1938-12Foundation investigation, Lock site no.2, proposed Pearl River improvementU.S. Army Engineer Waterways Experiment Station.
1944-01Investigation of stability of asphalt paving mixtures. Interim report no. 1, A stability method and apparatus for the design and control of asphalt paving mixtures in the fieldU.S. Army Engineer Waterways Experiment Station.
1938-07Report of tests on foundation and overburden material, Proposed Lock and Dam, Demopolis, Ala. (Mile 227 Tombigbee River)U.S. Army Engineer Waterways Experiment Station.
1938-04Study of permeability of rock jetty modelsU.S. Army Engineer Waterways Experiment Station.
1952-04Pumping tests on pressure-relief well system outlet structure excavation : Grenada DamUnited States. Mississippi River Commission.; U.S. Army Engineer Waterways Experiment Station.
1959-02A limited study of snap-tracsU.S. Army Engineer Waterways Experiment Station.
1950-06Investigation of underseepage and its control by relief wells : Commerce and Trotters, Mississippi, Volume 2U.S. Army Engineer Waterways Experiment Station.
1956-10Review of soils design, construction, and prototype analysis, Blakely Mountain Dam, ArkansasU.S. Army Engineer Waterways Experiment Station.
1955-08Memphis, Wolf River & Nonconnah Creek, Tennessee Project : section 1-B floodwall : investigation of failure of Wolf River bank and preliminary investigation of alternative wall alignmentU.S. Army Engineer Waterways Experiment Station.