Search


Current filters:

Start a new search
Add filters:

Use filters to refine the search results, then click the above search button.


Results 1-10 of 2831 (Search time: 0.521 seconds).
Item hits:
Issue DateTitleAuthor(s)
1994-11Calculation of suspended sediment transport by combined wave-current flowsWikramanayake, Palitha Nalin.; Madsen, Ole Secher.
1996-06Upper Mississippi River System-Environmental Management Program Definite Project Report (SL-7) with Integrated Environmental Assessment : Calhoun Point Habitat Rehabilitation and Enhancement Project, Main Report and Apendices, Pool 26, Illinois River, Calhoun County, IllinoisUnited States. Army. Corps of Engineers. St. Louis District.
1991-08Upper Mississippi River System Environmental Management Program Definite Project Report/Environmental Assessment (SP-12) : Spring Lake Peninsula Habitat Rehabilitation and Enhancement Project, Pool 5, Upper Mississippi River, Buffalo County, WisconsinUnited States. Army. Corps of Engineers. St. Paul District.
1996-02Charleston Harbor, Charleston, South Carolina : Final Feasibility Report with Environmental AssessmentUnited States. Army. Corps of Engineers. Charleston District.
1992-01Missouri River Reservoir System Analysis Model : Phase IIHydrologic Engineering Center (U.S.)
1996-01Halloween storm and storm of 4-5 January 1992 : implications for the occurrence of similar eventsGarcia, Andrew W.
1994-08HEC River Analysis System (HEC-RAS)Brunner, Gary W.; Bonner, Vernon R.
1998-02Upper Mississippi River System-Environmental Management Program Definite Project Report (SL-9) with Integrated Environmental Assessment : Stag Island Habitat Rehabilitation and Enhancement Project (HREP), Pool 25, Mississippi River, Lincoln County, MissouriUnited States. Army. Corps of Engineers. St. Louis District.
1994-07Nondestructive Testing, Evaluation, and Rehabilitation for Roadway Pavements : Warren County, Mississippi, Cincinnati, Ohio, and Berkeley, CaliforniaGrau, Richard H.; Alexander, Don R.
1998-07Flood Control, Mississippi River & Tributaries, Mississippi River Mainline Levees Enlargement and Seepage Control, Cape Girardeau, Missouri to Head of Passes, Louisiana : Volume I, Project Report, Supplement No. 1 to the Final Environmental Impact Statement, Mississippi River and Tributaries Project, Mississippi River Levees and Channel Improvement, and Appendices 1-4United States. Army. Corps of Engineers. Vicksburg District.; United States. Army. Corps of Engineers. Memphis District.; United States. Army. Corps of Engineers. New Orleans District.