Please use this identifier to cite or link to this item: https://hdl.handle.net/11681/7583
Title: Inspections of previously monitored rubble-mound coastal structures
Authors: Bottin, Robert R.
Tolliver, Larry R.
Myrick, Glenn B.
Keywords: Armor units
Breakwaters
Coastal structure inspections
Core-Locs
Dolosse
Jetties
Issue Date: Sep-2004
Publisher: Coastal and Hydraulics Laboratory (U.S.)
Engineer Research and Development Center (U.S.)
Series/Report no.: ERDC/CHL TR ; 04-11.
Description: Technical report
This report presents results of inspections of rubble-mound coastal structures monitored previously under the Monitoring Completed Navigation Projects (MCNP) Program. Expedient, low-cost walking inspections were performed at 11 sites. Positions of breakwater and jetty armor units were compared with their positions in previous aerial photography and photogrammetric surveys. Settlement of portions of the structures as well as voids in their armor cover also was noted, and photographs of the structures were obtained. Summaries of inspection results as well as recommendations are presented in this report. The work was conducted under the “Periodic Inspections” work unit of the MCNP Program.
URI: http://hdl.handle.net/11681/7583
Appears in Collections:Technical Report

Files in This Item:
File Description SizeFormat 
CHL-TR-04-11.pdf5.36 MBAdobe PDFThumbnail
View/Open