Please use this identifier to cite or link to this item: https://hdl.handle.net/11681/7348
Full metadata record
DC FieldValueLanguage
dc.contributor.authorFrey, Ashley E.en_US
dc.contributor.authorKing, David B. (David Byron)en_US
dc.contributor.authorMunger, Sophieen_US
dc.creatorCoastal Inlets Research Program (U.S.)en_US
dc.creatorBlue Science Consultants, LLCen_US
dc.creatorCoastal and Hydraulics Laboratory (U.S.)en_US
dc.date.accessioned2016-05-06T14:32:03Zen_US
dc.date.available2016-05-06T14:32:03Zen_US
dc.date.issued2014-08en_US
dc.identifier.govdocERDC/CHL TR-14-6en_US
dc.identifier.urihttp://hdl.handle.net/11681/7348en_US
dc.descriptionTechnical Reporten_US
dc.description.abstractThis is the second report in a series describing applications with the new shoreline change and sand transport model, GenCade. It is considered as a companion report to the first report in the GenCade series, Frey et al. (2012a), and provides additional details that were not described in that report. This report describes basic assumptions in GenCade, requirements to run the model, and recommendations about important GenCade capabilities. While all of the basic assumptions are discussed, this report also considers if the assumptions are satisfied and describes a procedure to follow when they are not. All of the required and optional input and output files are explained, and common user errors in model setup, with solutions, are detailed. These user errors may not be evident to new users but are easily corrected. Although the model will run even if the recommendations are not followed, the results may not represent the regional system as well as if properly set up. The recommendations section explains specific capabilities like the regional contour and the Inlet Reservoir Model (IRM) and topics such as project work flow and grid cell spacing. By following these recommendations, the user will produce better results. Finally the path forward for the model and future guidance are discussed.en_US
dc.description.sponsorshipCoastal Inlets Research Program (U.S.)en_US
dc.description.sponsorshipUnited States. Army. Corps of Engineersen_US
dc.description.tableofcontentsAbstract .......................................................................................................................................................... ii Figures and Tables.........................................................................................................................................v Preface........................................................................................................................................................... ix Unit Conversion Factors ............................................................................................................................. xi List of Symbols and Abbreviations .......................................................................................................... xii 1 Introduction............................................................................................................................................1 1.1 Overview......................................................................................................................... 1 1.2 GenCade development history...................................................................................... 2 1.3 Status of existing GenCade documentation ................................................................ 2 1.4 Purpose of additional documentation.......................................................................... 3 1.5 Report organization....................................................................................................... 4 2 Basic Assumptions ...............................................................................................................................5 2.1 Description of basic assumptions ................................................................................ 5 2.1.1 Assumption 1 ................................................................................................................. 6 2.1.2 Assumption 2 ................................................................................................................. 9 2.1.3 Assumption 3 ............................................................................................................... 11 2.2 Model assumptions at a study site.............................................................................12 2.3 Procedure for cases that violate basic assumptions.................................................14 3 GenCade Requirements.....................................................................................................................16 3.1 Basic requirements to run GenCade ..........................................................................16 3.1.1 Required input files......................................................................................................16 3.1.2 Optional input files .......................................................................................................27 3.1.3 GenCade Model Execution ..........................................................................................29 3.1.4 Output files ................................................................................................................... 31 3.2 Common setup mistakes ............................................................................................33 3.2.1 SMS license problems .................................................................................................33 3.2.2 Failure to properly define each feature ......................................................................34 3.2.3 Mistakes when merging coverages in the conceptual model ...................................38 3.2.4 Improper placement of structures ..............................................................................40 3.2.5 Gated boundary condition mistakes ...........................................................................49 3.2.6 Incorrect input waves...................................................................................................51 3.2.7 Incorrect time-step.......................................................................................................56 3.2.8 Failure to modify model control...................................................................................58 3.2.9 Executable location......................................................................................................62 3.2.10 Path names and placement of input files..............................................................62 3.2.11 Opening *.gen files and *.sms files in the SMS....................................................63 4 Recommendations for GenCade Applications..............................................................................67 4.1 Work flow for a GenCade project................................................................................67 4.1.1 Introduction .................................................................................................................. 67 4.1.2 Project initiation ...........................................................................................................69 4.1.3 Collection of input data................................................................................................70 4.1.4 Model setup.................................................................................................................. 70 4.1.5 Calibration, validation, and sensitivity testing............................................................71 4.1.6 Production runs............................................................................................................73 4.1.7 Analysis and interpretation of results .........................................................................74 4.1.8 Final report ................................................................................................................... 74 4.2 Standards for cell spacing .......................................................................................... 74 4.2.1 Cell spacing for constant resolution ...........................................................................74 4.2.2 Variable cell spacing ....................................................................................................75 4.3 Angle between shoreline and x-axis ...........................................................................87 4.4 Stability parameter......................................................................................................92 4.4.1 Stability parameter error messages............................................................................92 4.4.2 Solutions for stability parameter issues .....................................................................94 4.4.3 Understanding the stability parameter.......................................................................98 4.5 ISMOOTH......................................................................................................................99 4.5.1 Number of cells in the offshore contour smoothing window (ISMOOTH)..................99 4.5.2 Definition of ISMOOTH...............................................................................................100 4.5.3 Determination of optimal ISMOOTH value................................................................100 4.5.4 Other considerations .................................................................................................104 4.6 Regional contour .......................................................................................................104 4.6.1 What is a regional contour?.......................................................................................104 4.6.2 When should a regional contour be used?...............................................................106 4.6.3 How is the shape of a regional contour generated? ................................................108 4.6.4 Example ......................................................................................................................114 4.7 Inlet Reservoir Model ................................................................................................119 4.7.1 Introduction ................................................................................................................119 4.7.2 Analytical model.........................................................................................................121 4.7.3 Initial volumes and equilibrium volumes ..................................................................126 4.7.4 Attachment bars.........................................................................................................129 4.7.5 Bypassing coefficient.................................................................................................132 4.7.6 Example ......................................................................................................................134 5 Summary and Future Guidance.....................................................................................................142 References ................................................................................................................................................144 Report Documentation Pageen_US
dc.format.extent165 pages/15.61 MBen_US
dc.format.mediumPDFen_US
dc.language.isoen_USen_US
dc.publisherEngineer Research and Development Center (U.S.)en_US
dc.relationhttp://acwc.sdp.sirsi.net/client/en_US/search/asset/1035963en_US
dc.relation.ispartofseriesTechnical report (Engineer Research and Development Center (U.S.)) ; no.ERDC/CHL TR-14-6en_US
dc.rightsApproved for public release; distribution is unlimiteden_US
dc.sourceThis Digital Resource was created in Microsoft Word and Adobe Acrobaten_US
dc.subjectGenCadeen_US
dc.subjectWork flowen_US
dc.subjectShoreline changeen_US
dc.subjectInlet reservoir modelen_US
dc.subjectSand transporten_US
dc.subjectSediment transporten_US
dc.subjectRegional contouren_US
dc.subjectSurface-water Modeling Systemen_US
dc.subjectStability parameteren_US
dc.subjectComputer programsen_US
dc.subjectCoastal Inlets Research Program (U.S.)en_US
dc.titleRecommendations and requirements for GenCade simulationsen_US
dc.typeReporten_US
Appears in Collections:Technical Report
Technical Report

Files in This Item:
File Description SizeFormat 
ERDC-CHL-TR-14-6.pdfERDC/CHL TR-14-615.61 MBAdobe PDFThumbnail
View/Open