dc.contributor.authorMyrick, Glenn B.-
dc.contributor.authorMelby, Jeffrey A.-
dc.contributor.authorBurg, Elizabeth C.-
dc.date.accessioned2016-05-06T14:32:00Z-
dc.date.available2016-05-06T14:32:00Z-
dc.date.issued2015-05-
dc.identifier.govdocERDC/CHL TR-15-6-
dc.identifier.urihttp://hdl.handle.net/11681/7340-
dc.descriptionTechnical Report-
dc.description.abstractMonitoring Completed Navigation Projects (MCNP) Program evaluates the structural and functional performance of existing navigation structures. Under Periodic Inspections, aerial photography, ground-truth surveys, walking inspections, photogrammetry, and lidar elevation data are used to periodically assess the structural conditions of selected structures. A database of these structures is being compiled for asset management and other purposes. Cleveland Harbor East Breakwater, OH, has sustained extensive damage since its construction in 1915. The Breakwater has had an extensive repair history, including a major rehabilitation in 1979–80 involving the placement of 2-ton dolosse on the lakeward slope and crest of the easterly 4,400 feet (ft). Some failed and were replaced with 4-ton dolosse. Other repairs took place in 1986, 1989, 1991, and 2001 on the nondolos sections. Burns Harbor North Breakwater, IN, is a 4,640 ft rubble-mound structure constructed in 1969. The Breakwater has required extensive maintenance including the addition of 290 kilotons of stone through 1989. A submerged reef was constructed between 1995 and 1998, 75 ft lakeward of the Breakwater, to reduce wave energy reaching the structure. Records indicate that 1,128 broken and/or cracked dolosse, and 282 damaged armor stones, were documented during the 2006 Periodic Inspections of Cleveland Harbor East Breakwater and Burns Harbor North Breakwater, respectively. This interim data report contains a precise record of dolos and stone armor damage existing in July 2006 on these structures. A comprehensive analysis and technical report correlating this damage with storm and water level conditions will be published at a later date as subsequent additional field data are obtained at these two Great Lakes breakwaters.-
dc.description.sponsorshipMonitoring Completed Navigation Projects Program (U.S.)-
dc.description.tableofcontentsAbstract .......................................................................................................................................................... ii Figures and Tables.........................................................................................................................................v Preface...........................................................................................................................................................vii Unit Conversion Factors ............................................................................................................................. ix 1 Introduction............................................................................................................................................1 1.1 Monitoring Completed Navigation Projects (MCNP) program ..................................... 1 1.2 Work unit objective and monitoring approach............................................................. 2 1.3 Project locations and brief histories............................................................................. 3 1.3.1 Cleveland Harbor, Cleveland, OH.................................................................................. 3 1.3.2 Burns Harbor, Portage, IN ............................................................................................. 8 1.4 Dolos armor units and break types ............................................................................12 2 Cleveland Harbor East Breakwater Prior Monitoring..................................................................16 2.1 Cleveland Harbor East Breakwater 1980–1985 initial monitoring..........................16 2.1.1 Dolos armor monitoring...............................................................................................16 2.1.2 Stone armor monitoring...............................................................................................19 2.2 Cleveland Harbor East Breakwater 1993 Periodic Inspections monitoring .............20 2.3 Cleveland Harbor East Breakwater 1997 Periodic Inspections walking inspection ...............................................................................................................................24 2.4 Cleveland Harbor East Breakwater 2004 Periodic Inspections walking inspection ...............................................................................................................................25 3 Burns Harbor North Breakwater Prior Monitoring .......................................................................27 3.1 Burns Harbor North Breakwater 1985–1992 initial monitoring (comprehensive).....................................................................................................................27 3.2 Burns Harbor North Breakwater 1994–1995 Periodic Inspections monitoring (base conditions).................................................................................................30 3.3 Burns Harbor North Breakwater 1999 Periodic Inspections walking inspection ...............................................................................................................................31 3.4 Burns Harbor North Breakwater 2004 Periodic Inspections walking inspection ...............................................................................................................................33 4 2006 Periodic Inspections Monitoring Plan and Walking Inspections ...................................35 4.1 Ground-truth surveys...................................................................................................36 4.2 Detailed walking inspections ......................................................................................36 4.3 Light detection and ranging (lidar) .............................................................................37 4.4 2006 Periodic Inspections walking inspections ........................................................38 4.4.1 Cleveland Harbor East Breakwater broken dolos walking inspection ......................38 4.4.2 Burns Harbor North Breakwater broken stone walking inspection...........................42 5 Summary and Conclusions ...............................................................................................................45 References ...................................................................................................................................................47 Appendix A: Broken/Damaged Dolos Armor Units (Type of Breaks and Locations) on the Cleveland Harbor East Breakwater, July 2006 Walking Inspection..................................50 Appendix B: Broken/Damaged Stone Armor Units (Type of Stone and Breaks) on Burns Harbor North Breakwater, August 2006 Walking Inspection ...................................101 Report Documentation Page-
dc.format.extent122 pages / 5.796 Mb-
dc.format.mediumPDF-
dc.publisherCoastal and Hydraulics Laboratory (U.S.)-
dc.publisherEngineer Research and Development Center (U.S.)-
dc.relationhttp://acwc.sdp.sirsi.net/client/en_US/search/asset/1043726-
dc.relation.ispartofseriesTechnical Report (Engineer Research and Development Center (U.S.)) ; no. ERDC/CHL TR-15-6-
dc.rightsApproved for public release; distribution is unlimited.-
dc.sourceThis Digital Resource was created in Microsoft Word and Adobe Acrobat-
dc.subjectAerial photography-
dc.subjectBreakwaters-
dc.subjectConcrete armor units-
dc.subjectDolosse-
dc.subjectLidar-
dc.subjectRubble-mound structures-
dc.subjectWave climate-
dc.subjectCoastal structures-
dc.subjectGreat Lakes-
dc.titlePeriodic inspections of Cleveland Harbor East Breakwater, Ohio, and Burns Harbor North Breakwater, Indiana-