Please use this identifier to cite or link to this item: https://hdl.handle.net/11681/6591
Full metadata record
DC FieldValueLanguage
dc.contributorUnited States. Army. Engineer Research and Development Laboratories-
dc.contributor.authorUnited States. Army. Corps of Engineers. New England Division-
dc.date.accessioned2016-03-23T20:17:36Z-
dc.date.available2016-03-23T20:17:36Z-
dc.date.issued1956-05-
dc.identifier.urihttp://hdl.handle.net/11681/6591-
dc.descriptionTechnical Report-
dc.descriptionSummary: The purpose of Project 1, Approach Roads in Boulder Fields, was to develop effective methods and techniques for the construction and maintenance of roads on a bouldery, permafrost terrain, typified by the TUTO area near Thule Air Force Base, Greenland. The purpose of Project 10A, Ramp Roads, was to investigate and develop methods, techniques, and design criteria for construction and maintenance of gravel-fill roads on ice surfaces of the glacial type such as occurs at TUTO. This report summarizes the results of field work from June to September 1954 on the phases assigned to the Arctic Construction and Frost Effects Laboratory. The report has been kept as concise as possible, dealing only with the most pertinent aspects of the entire problem.-
dc.publisherArctic Construction and Frost Effects Laboratory (U.S.)-
dc.publisherEngineer Research and Development Center (U.S.)-
dc.relationhttp://acwc.sdp.sirsi.net/client/en_US/search/asset/1024705-
dc.relation.ispartofseriesTechnical report (Arctic Construction and Frost Effects Laboratory (U.S.)) ; no. 64.-
dc.rightsApproved for public release; distribution is unlimited.-
dc.sourceThis Digital Resource was created from scans of the Print Resource-
dc.subjectRoads-
dc.subjectGlaciers-
dc.subjectGlacier ice-
dc.subjectThaw-
dc.subjectDepth-
dc.subjectPermafrost-
dc.subjectConstruction-
dc.subjectGreenland-
dc.subjectTuto, Greenland-
dc.subjectThule, Greenland-
dc.subjectEPOLAR-
dc.titleApproach Roads, Greeland 1954 Program, Projects 1 and 10A-
dc.typeReporten_US
Appears in Collections:Technical Report

Files in This Item:
File Description SizeFormat 
ACFEL-Technical-Report-64.pdf17.07 MBAdobe PDFThumbnail
View/Open