Please use this identifier to cite or link to this item: https://hdl.handle.net/11681/48377
Title: Blue River Greenway Master Plan Study : Phase 1 Report
Authors: United States. Army. Corps of Engineers. Kansas City District
Keywords: Greenways
Trails
Planning
Recreation
Kansas City (Mo.)
Environmental management
Environmental protection
Publisher: United States. Army. Corps of Engineers. Kansas City District
Abstract: The study area for the Blue River Greenway Master Plan extends from the mouth of the Blue River to the Banister Federal Complex, generally bounded by I-435 on the east and on the west a general line following Hardesty north of 40th Street, 71 Highway between 40th and 75th Streets, and Holmes Road south of 75th Street. The purpose of the plan was to assess the corridor to identify potential greenway elements that can connect related greenway and trail planning projects underway in adjacent basins, based on the MetroGreen Action Plan. An additional purpose of the plan was to identify a conceptual route for a trail from Swope Park to Truman Road. A separate report documents this plan.
Description: Master Plan
Rights: Approved for Public Release; Distribution is Unlimited
URI: https://hdl.handle.net/11681/48377
Appears in Collections:Environmental Documents

Files in This Item:
File Description SizeFormat 
Blue River Greenway Master Plan - Phase I Report - 2005.pdf31.96 MBAdobe PDFThumbnail
View/Open