Please use this identifier to cite or link to this item: https://hdl.handle.net/11681/4793
Full metadata record
DC FieldValueLanguage
dc.contributor.authorU.S. Army Engineer Waterways Experiment Station.-
dc.date.accessioned2016-03-17T14:34:12Z-
dc.date.available2016-03-17T14:34:12Z-
dc.date.issued1976-11-
dc.identifier.urihttp://hdl.handle.net/11681/4793-
dc.descriptionInformation Report-
dc.descriptionAbstract: This Guide establishes format requirements for scientific and technical reports prepared under contracts with the U. S. Army Engineer Waterways Experiment Station. Its provisions are mandatory for contract reports except where options are permitted.-
dc.publisherU.S. Army Engineer Waterways Experiment Station.-
dc.publisherEngineer Research and Development Center (U.S.)-
dc.relationhttp://acwc.sdp.sirsi.net/client/en_US/search/asset/1024741-
dc.relation.ispartofseriesInstruction report (U.S. Army Engineer Waterways Experiment Station) ; O-76-1.-
dc.rightsApproved for public release; distribution is unlimited.-
dc.sourceThis Digital Resource was created from scans of the Print Resource-
dc.subjectEditorial standards-
dc.subjectEditing-
dc.subjectTechnical Writing-
dc.titleGuide for preparation of Waterways Experiment Station contract reports-
dc.typeDOCUMENT-
Appears in Collections:Documents

Files in This Item:
File Description SizeFormat 
Information-Report-O-76-1.pdf5.13 MBAdobe PDFThumbnail
View/Open