Contract Report : [37] Collection home page

Browse
Subscribe to this collection to receive daily e-mail notification of new additions RSS Feed RSS Feed RSS Feed
Collection's Items (Sorted by Submit Date in Descending order): 1 to 20 of 37
Issue DateTitleAuthor(s)
2018-07Measurement of Blast Waveforms with Condenser Microphones : Measurement Interpretation and CorrectionGabrielson, Thomas B.
2018-04Laboratory investigation of natural cementation road surfacing for corrosion control of aluminum on Army vehicles : contractor’s supplemental report for Project F10-AR06Ooi, Phillip S. K., 1961-
2001-10Historic limestone conservation study for Fort Riley, KansasJensen, Mayda S.
2017-12Modeling the effect of a hydrophobic concrete admixture on chloride ingress : contractor's supplemental report for CPC Project F09-AR05ASamson, Eric.; Zhang, Tiewei.
2017-12Hydrophobic concrete admixture product testing and validation : contractor's supplemental report for CPC Project F09-AR05AWachowski, Lawrence R.; Tourney, Paul G.; Miltenberger, Matthew A.; Berke, Neal S.
2017-10Historic structure assessment for Building 839, Carlisle Barracks: Carlisle, PennsylvaniaVitanza, Thomas A.; Slater, Mark.; Clinton-Selin, Caitlin.
2017-07Fort Leonard Wood German POW stonework : maintenance and repairJackson, Sarah Marie.; Church, Jason.
2016-12Investigation of bending test procedures for engineered polymer composite railroad tiesBall, Claire G.
2016-09Field testing and load rating report for Bridge No. 4, composite grid reinforcement of concrete deck, at Fort Knox, Kentucky : contractor’s supplemental report for Project F12-AR01Commander, Brett C.; Carpenter, Brice Alan, 1987-
2016Field testing and load rating report for Bridge No. 4, hybrid composite beam span, at Fort Knox, Kentucky : contractor's supplemental report for Project F12-AR15Commander, Brett C.; Carpenter, Brice Alan, 1987-
2016Field testing and summary report for Road 5 (Morris Road) over Road 3 (Toftoy Throughway) at Redstone Arsenal, AL : contractor's supplemental report for Project F09-AR16Commander, Brett C.; Aschermann, Scott.
2010-08Developing best practices for capturing as-built building information models (BIM) for existing facilitiesRojas, Eddy; Dossick, Carrie; Schaufelberger, John
2010-08Evaluating alternative methodologies for capturing as-built building information models (BIM) for existing facilitiesRojas, Eddy; Dossick, Carrie; Schaufelberger, John
2012-03Feasibility of energy crops grown on Army landsLouis Berger and Associates; Utah State University
2011-09Experimental building information modelsJohnson, Mark.; Fallon, Kristine K.
2003-01Technology demonstration of nontoxic chemical stripper for steel: cost and performance reportAppleman, Bernard.; Nau, Patrick.
2003-07A survey of Plethodon sp. (Plethodontidae) salamander populations in caves and sinkholes at Fort Hood, TexasTaylor, Steven J.; Phillips, Christopher A.
2005-11ECOTONE ManualHochstrasser, Tamara Margrit Carola.; Peters, Debra
2012-05Life-cycle model of mission-ready and sustainable facilities, planning space resource utilization : COBie representation of resource demands for mission-ready and sustainable facilitiesEast, E. William; Weizel, Avi.; Bryan, Harvey.; Chasey, Allan D.
2005-08Sound wave mitigation through the design or surface impedanceChew, Weng Cho.; Wang, Gong Li
Collection's Items (Sorted by Submit Date in Descending order): 1 to 20 of 37