Search


Current filters:

Start a new search
Add filters:

Use filters to refine the search results, then click the above search button.


Results 1-10 of 17 (Search time: 0.0 seconds).
Item hits:
Issue DateTitleAuthor(s)
1959-02Performance of rubberized-tar concrete pavements on airfield facilitiesU.S. Army Engineer Waterways Experiment Station.
1957-05Possible auxiliary uses of extruded T-11 aluminum and T-8 magnesium landing matsMississippi State University. Department of Civil and Environmental Engineering.; McCain, D. M.
1955-05Guide for use in preparation of Waterways Experiment Station reportsU.S. Army Engineer Waterways Experiment Station.
1952-04Pumping tests on pressure-relief well system outlet structure excavation : Grenada DamUnited States. Mississippi River Commission.; U.S. Army Engineer Waterways Experiment Station.
1959-02A limited study of snap-tracsU.S. Army Engineer Waterways Experiment Station.
1955-08Memphis, Wolf River & Nonconnah Creek, Tennessee Project : section 1-B floodwall : investigation of failure of Wolf River bank and preliminary investigation of alternative wall alignmentU.S. Army Engineer Waterways Experiment Station.
1958-08Tests of concrete aggregates : Carlyle Reservoir, St. Louis DistrictU.S. Army Engineer Waterways Experiment Station.
1959-03Tests of concrete aggregates, Carlyle, Reservoir, St. Louis District. Appendix A, Tests of Huelsman quarry stone for suitability for use as riprap, Carlyle DamUnited States. Army. Corps of Engineers. St. Louis District.; Materials and Concrete Laboratory (U.S.); United States. Army. Corps of Engineers. Lower Mississippi Valley Division.
1959-09Trafficability predictions in tropical soils : four soils in the Panama Canal Zone, report 1U.S. Army Engineer Waterways Experiment Station
1958-08A limited study of factors that affect soil strengthU.S. Army Engineer Waterways Experiment Station