Please use this identifier to cite or link to this item: https://hdl.handle.net/11681/43283
Title: Vessel speed analysis before and after dredging near Missouri River mile 282 in November 2020
Authors: Kress, Marin M.
Keywords: Inland navigation
Missouri River
Dredging
Publisher: Engineer Research and Development Center (U.S.)
Series/Report no.: Technical Note (Engineer Research and Development Center (U.S.)) ; no. ERDC/CHL CHETN-IX-59
Abstract: The purpose of this Coastal and Hydraulics Engineering Technical Note (CHETN) is to present information on vessel traffic before, during, and after a dredging event around river mile 282 of the Missouri River in November 2020 along with contextual information about tonnage and commodities that utilize this navigation project.
Description: Technical Note
Gov't Doc #: ERDC/CHL CHETN-IX-59
Rights: Approved for Public Release; Distribution is Unlimited
URI: https://hdl.handle.net/11681/43283
http://dx.doi.org/10.21079/11681/43283
Size: 9 pages / 2.25 MB
Types of Materials: PDF
Appears in Collections:Technical Note

Files in This Item:
File Description SizeFormat 
ERDC-CHL CHETN-IX-59.pdf2.25 MBAdobe PDFThumbnail
View/Open