Please use this identifier to cite or link to this item:
https://hdl.handle.net/11681/43283
Title: | Vessel speed analysis before and after dredging near Missouri River mile 282 in November 2020 |
Authors: | Kress, Marin M. |
Keywords: | Inland navigation Missouri River Dredging |
Publisher: | Engineer Research and Development Center (U.S.) |
Series/Report no.: | Technical Note (Engineer Research and Development Center (U.S.)) ; no. ERDC/CHL CHETN-IX-59 |
Abstract: | The purpose of this Coastal and Hydraulics Engineering Technical Note (CHETN) is to present information on vessel traffic before, during, and after a dredging event around river mile 282 of the Missouri River in November 2020 along with contextual information about tonnage and commodities that utilize this navigation project. |
Description: | Technical Note |
Gov't Doc #: | ERDC/CHL CHETN-IX-59 |
Rights: | Approved for Public Release; Distribution is Unlimited |
URI: | https://hdl.handle.net/11681/43283 http://dx.doi.org/10.21079/11681/43283 |
Size: | 9 pages / 2.25 MB |
Types of Materials: | |
Appears in Collections: | Technical Note |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
ERDC-CHL CHETN-IX-59.pdf | 2.25 MB | Adobe PDF | ![]() View/Open |