Please use this identifier to cite or link to this item:
https://hdl.handle.net/11681/42563
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.author | United States. Army. Corps of Engineers. Walla Walla District | - |
dc.date.accessioned | 2021-12-10T19:14:11Z | - |
dc.date.available | 2021-12-10T19:14:11Z | - |
dc.date.issued | 2021-09 | - |
dc.identifier.uri | https://hdl.handle.net/11681/42563 | - |
dc.description | Feasibility Study and Environmental Assessment | en_US |
dc.description.abstract | The U.S. Army Corps of Engineers (Corps/USACE), Walla Walla District (District), and the non-Federal Sponsor (NFS), Mill Creek Flood Control Zone District (MCFCZD), conducted a flood risk management study to address the risks Mill Creek presents to the community of Walla Walla, Washington, and other communities within the Mill Creek watershed (adjacent lands). The integrated Mill Creek Flood Risk Management General Investigation Feasibility Study and Environmental Assessment Report documents the results of the feasibility study and environmental compliance processes. It presents the process, analysis, and conclusions of the investigations and analysis performed to evaluate potential improvements to the existing Mill Creek Flood Control Project (MCFCP). As a result of the study and associated analysis, a Recommended Plan that could also improve aquatic habitat and fish passage conditions and avoid obstructing the ability of others to make such improvements within the study area was developed and is described below. | en_US |
dc.description.sponsorship | United States. Army. Corps of Engineers. | en_US |
dc.format.extent | 1354 pages / 139.87 MB | - |
dc.format.medium | - | |
dc.language.iso | en_US | en_US |
dc.publisher | United States. Army. Corps of Engineers. Walla Walla District. | en_US |
dc.rights | Approved for Public Release; Distribution is Unlimited | - |
dc.source | This Digital Resource was created in Microsoft Word and Adobe Acrobat | - |
dc.subject | Walla Walla (Wash.) | en_US |
dc.subject | Flood control | en_US |
dc.subject | Environmental management | en_US |
dc.subject | Environmental protection | en_US |
dc.title | Mill Creek Flood Risk Management General Investigation : Feasibility Study and Environmental Assessment | en_US |
dc.type | Report | en_US |
Appears in Collections: | Environmental Documents |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
Mill Creek Flood Risk Management GI_ FS and EA_2021.pdf | 139.87 MB | Adobe PDF | View/Open |