Please use this identifier to cite or link to this item: https://hdl.handle.net/11681/40659
Title: Final Environmental Impact Statement : Freeport Harbor Channel Improvement Project, Brazoria County, Texas
Authors: United States. Army. Corps of Engineers. Galveston District.
Keywords: Freeport (Tex.)--Harbors
Inland navigation
Channels (Hydraulic engineering)
Environmental protection
Environmental management
Publisher: United States. Army. Corps of Engineers. Galveston District.
Abstract: The U.S. Army Corps of Engineers, Galveston District (USACE) joined in an agreement with the Brazos River Harbor Navigation District (now named Port Freeport) to conduct a feasibility study and prepare an Environmental Impact Statement (EIS) for proposed improvements to the Freeport Harbor Channel. The Freeport Harbor Channel Improvement Project (FHCIP) proposes to deepen and selectively widen the Freeport Harbor Channel and associated turning basins (except Brazos Harbor Turning Basin), up to and including the Stauffer Turning Basin to eliminate existing operational constraints. The USACE is the lead agency for this project, with no cooperating agencies. This EIS was prepared as required by the National Environmental Policy Act to present an evaluation of potential impacts associated with the proposed FHCIP.
Description: Environmental Impact Statement
Rights: Approved for Public Release; Distribution is Unlimited
URI: https://hdl.handle.net/11681/40659
Size: Volume 1 : 347 pages / 19.53 Mb Volume 2 : 854 pages / 38.79 Mb
Types of Materials: PDF
Appears in Collections:Environmental Documents

Files in This Item:
File Description SizeFormat 
FINAL FHCIP FEIS_Vol-I_August 2012.pdf19.53 MBAdobe PDFThumbnail
View/Open
FINAL FHCIP FEIS Vol II Appendices.pdf38.79 MBAdobe PDFThumbnail
View/Open