Please use this identifier to cite or link to this item: https://hdl.handle.net/11681/39505
Full metadata record
DC FieldValueLanguage
dc.contributor.authorUnited States. Army. Corps of Engineers. Fort Worth District.-
dc.date.accessioned2021-01-19T19:36:17Z-
dc.date.available2021-01-19T19:36:17Z-
dc.date.issued2012-02-
dc.identifier.urihttps://hdl.handle.net/11681/39505-
dc.descriptionEnvironmental Assessment-
dc.description.abstractThe United States Army Corps of Engineers (USACE) has prepared this Environmental Assessment (EA) in accordance with the National Environmental Policy Act of 1969 (42 United States Code [USC] §§ 4321, et seq.), the Council on Environmental Quality regulations found in 40 Code of Federal Regulations (CFR) Parts 1500-1508, and USACE regulations found in 33 CFR Part 230. This EA describes the potential environmental consequences resulting from implementation of proposed improvements to the Baker Pumping Plant in the City of Dallas, Texas (i.e., the “Proposed Action”). The purpose of the Proposed Action is to provide flood risk management for the 100-year, 24-hour storm event for the Baker Pumping Plant service area within the Hampton-Oak Lawn Basin. The City of Dallas needs to implement Baker Pumping Plant improvements because people and property in the Hampton-Oak Lawn Basin are currently subject to stormwater flooding impacts. By improving the Baker Pumping Plant, the City of Dallas would be able to provide improved flood risk management to people and property in the Hampton-Oak Lawn Basin. Section 5141 of the Water Resources Development Act of 2007 (Public Law 110-114; 121 Stat.1041) provides authorization for improvements to interior drainage for the Dallas Floodway. The proposed improvements to the Baker Pumping Plant would be implemented in compliance with 33 United States Code § 408. The City of Dallas is the action proponent.en_US
dc.description.sponsorshipUnited States. Army. Corps of Engineers.en_US
dc.format.extent78 pages / 3.82 MB-
dc.format.mediumPDF-
dc.language.isoen_USen_US
dc.publisherUnited States. Army. Corps of Engineers. Fort Worth District.en_US
dc.rightsApproved for Public Release; Distribution is Unlimited-
dc.sourceThis Digital Resource was created in Microsoft Word and Adobe Acrobat-
dc.subjectDallas (Tex.)en_US
dc.subjectFlood controlen_US
dc.subjectPumping stationsen_US
dc.subjectEnvironmental managementen_US
dc.subjectEnvironmental protectionen_US
dc.titleEnvironmental Assessment : Proposed Baker Pumping Plant Improvements, Dallas, Texasen_US
dc.typeReporten_US
Appears in Collections:Environmental Documents

Files in This Item:
File Description SizeFormat 
Baker_Pump_Station_Final_Environmental_Assessment_23_Feb_2012.pdf3.82 MBAdobe PDFThumbnail
View/Open