Please use this identifier to cite or link to this item: https://hdl.handle.net/11681/39504
Full metadata record
DC FieldValueLanguage
dc.contributor.authorUnited States. Army. Corps of Engineers. Fort Worth District.-
dc.date.accessioned2021-01-19T19:01:05Z-
dc.date.available2021-01-19T19:01:05Z-
dc.date.issued2014-06-
dc.identifier.urihttps://hdl.handle.net/11681/39504-
dc.descriptionEnvironmental Assessment-
dc.description.abstractThe United States Army Corps of Engineers (USACE) has prepared this Environmental Assessment (EA) in accordance with the National Environmental Policy Act of 1969 (42 United States Code §§ 4321, et seq.), the Council on Environmental Quality regulations found in 40 Code of Federal Regulations (CFR) Parts 1500-1508, and USACE regulations found in 33 CFR Part 230. This EA describes the potential environmental consequences resulting from implementation of proposed improvements to the Able Pumping Plant in the City of Dallas, Texas (i.e., the “Proposed Action”). The purpose of the Proposed Action is to provide flood risk management for the 100-year, 24-hour storm event for the Able Pumping Plant service area within the Able Basin. The City of Dallas needs to implement Able Pumping Plant improvements because people and property in the Able Basin are currently subject to stormwater flooding impacts that are not efficiently controlled by the existing Able Pumping Plant. By improving the Able Pumping Plant, the City of Dallas would be able to provide improved flood risk management to people and property in the Able Basin. Section 5141 of the Water Resources Development Act of 2007 (Public Law 110-114; 121 Stat.1041) provides authorization for improvements to interior drainage for the Dallas Floodway. The proposed improvements to the Able Pumping Plant would be implemented in compliance with 33 United States Code § 408. The City of Dallas is the action proponent.en_US
dc.description.sponsorshipUnited States. Army. Corps of Engineers.en_US
dc.format.extent112 pages / 3.96 MB-
dc.format.mediumPDF-
dc.language.isoen_USen_US
dc.publisherUnited States. Army. Corps of Engineers. Fort Worth District.en_US
dc.rightsApproved for Public Release; Distribution is Unlimited-
dc.sourceThis Digital Resource was created in Microsoft Word and Adobe Acrobat-
dc.subjectDallas (Tex.)en_US
dc.subjectFlood controlen_US
dc.subjectPumping stationsen_US
dc.subjectEnvironmental managementen_US
dc.subjectEnvironmental protectionen_US
dc.titleEnvironmental Assessment : Proposed Able Pumping Plant Improvements, City of Dallas, Texasen_US
dc.typeReporten_US
Appears in Collections:Environmental Documents

Files in This Item:
File Description SizeFormat 
Able_EA_Public_FINAL.pdf3.96 MBAdobe PDFThumbnail
View/Open