Please use this identifier to cite or link to this item: https://hdl.handle.net/11681/39340
Title: Final Marysville Ring Levee, Yuba River Basin, California, Environmental Assessment/Initial Study
Authors: United States. Army. Corps of Engineers. Sacramento District.
California. Central Valley Flood Protection Board.
Keywords: Marysville (Calif.)
Yuba River (Calif.)
Flood control
Levees
Environmental management
Environmental protection
Publisher: United States. Army. Corps of Engineers. Sacramento District.
Abstract: The Marysville Ring Levee was originally part of the 1999 Yuba River Basin Project, which included five miles of levee modifications along the MRL to address under-seepage. Since authorization, design refinements have been proposed due to improved information indicating significant geotechnical concerns, including levee under-seepage and through-seepage in the MRL. This EA/IS describes the design refinements and evaluates the effects of the proposed action. This Environmental Assessment/Initial Study 1) describes the existing environmental resources in the project area; 2) evaluates the effects and significance of the proposed action on the resources; and, 3) proposes measures to avoid, minimize, or mitigate any adverse effects to a less-than-significant level. This EA/IS is in compliance with the National Environmental Policy Act and the California Environmental Quality Act, and provides full disclosure of the effects of the proposed action.
Description: Environmental Assessment/Initial Study
Rights: Approved for Public Release; Distribution is Unlimited
URI: https://hdl.handle.net/11681/39340
Size: 477 pages / 21.81 MB
Types of Materials: PDF/A
Appears in Collections:Environmental Documents

Files in This Item:
File Description SizeFormat 
MRL Final EA COMPLETE 2010.pdf21.81 MBAdobe PDFThumbnail
View/Open