Please use this identifier to cite or link to this item:
https://hdl.handle.net/11681/38763
Title: | Environmental Assessment : Rehabilitation of Flood Control Works, Meadowhurst Levee, Benewah County, Idaho |
Authors: | United States. Army. Corps of Engineers. Seattle District. |
Keywords: | Saint Joe River (Idaho) Levees Flood control Environmental management Environmental assessment |
Publisher: | United States. Army. Corps of Engineers. Seattle District. |
Abstract: | The purpose of the project is to repair and restore the damaged levee in order to protect lives and property from subsequent flooding. The need is to take appropriate measures to address damage which has reduced the level of protection of the Meadowhurst levee. Prior to the damage, this levee offered an approximate 50-year level of protection. In the current damaged state, the levee provides protection from an approximate 3-year flood event. Without repair of the levee, the community is at risk to flood damages should another flood event occur in the St. Joe River. |
Description: | Environmental Assessment |
Rights: | Approved for Public Release; Distribution is Unlimited |
URI: | https://hdl.handle.net/11681/38763 |
Size: | 59 pages / 6.57 MB |
Types of Materials: | PDF/A |
Appears in Collections: | Environmental Documents |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
Meadowhurst Levee Rehabilitation EA_2018.pdf | 6.57 MB | Adobe PDF | ![]() View/Open |