Please use this identifier to cite or link to this item: https://hdl.handle.net/11681/38439
Title: East Camp Creek Watershed, Gallatin Tennessee : Section 205 Flood Risk Management
Authors: United States. Army. Corps of Engineers. Nashville District
Keywords: Gallatin (Tenn.)
Flood control
Environmental protection
Environmental management
Publisher: United States. Army. Corps of Engineers. Nashville District.
Abstract: The purpose of this report is to analyze potential solutions for flooding problems in the East Camp watershed, Gallatin, Tennessee. The report documents a Federal interest in implementation of a structural measure. This report has been prepared under the authority of Section 205 of the Flood Control Act of 1948, Pub. L. No. 80-858, as amended (codified at 33 U.S.C. § 701s), also referred to as Section 205 under the Continuing Authorities Program (CAP). The report presents the flood risk management (FRM) problems and opportunities within the East Camp Creek watershed as well as the measures and alternatives considered to reduce damages. The economic analysis for each management measure and alternative is documented and a tentatively selected plan (TSP) is recommended. The study was conducted in conjunction with the City of Gallatin, Tennessee (Gallatin) serving as the non-Federal sponsor (NFS) and the U.S. Army Corps of Engineers (USACE).
Description: Detailed Project Report and Environmental Assessment
Rights: Approved for Public Release; Distribution is Unlimited
URI: https://hdl.handle.net/11681/38439
Appears in Collections:Environmental Documents

Files in This Item:
File Description SizeFormat 
East Camp Creek Watershed Gallatin TN Sec 205 EA_2018.pdf15.27 MBAdobe PDFThumbnail
View/Open