Please use this identifier to cite or link to this item: https://hdl.handle.net/11681/37254
Title: Final Environmental Assessment & Finding of No Significant Impact : Eagle Island Improvements, Dike Raise to Elevation 50 Feet, Eagle Island Confined Disposal Facility, Upper Wilmington Harbor, Cape Fear River, Brunswick and New Hanover Counties, North Carolina
Authors: United States. Army. Corps of Engineers. Wilmington District
Keywords: Wilmington Harbor (N.C.)
Dredging
Dredging spoil
Dikes (Engineering)
Environmental protection
Environmental management
Publisher: United States. Army. Corps of Engineers. Wilmington District.
Abstract: Wilmington Harbor, located on North Carolina's southeast coast, is one of the state's two deepdraft ports and a major contributor to its economy. The Wilmington Harbor navigation project connects deep water of the Atlantic Ocean with North Carolina State Ports Authority facilities at Wilmington, waterfront facilities in downtown Wilmington, and several businesses north of the City of Wilmington, by way of a 38-mile-long channel along the Cape Fear River. The U. S. Army Corps of Engineers (USACE), Wilmington District, is responsible for maintaining the federally authorized Wilmington Harbor navigation project. The primary disposal facility for dredged material from the Upper Harbor reaches of the Wilmington Harbor is the Eagle Island Confined Disposal Facility (CDF), which is located on the peninsula between the Cape Fear and Brunswick Rivers, south of U.S. Highway 74/76. Improvements to the Eagle Island CDF are required to provide adequate dredged material disposal capacity for continued maintenance dredging of the Wilmington Harbor navigation project. This Environmental Assessment (EA) addresses the improvement of Cells 1, 2, and 3 of the Eagle Island CDF in relation to other alternatives.
Description: Environmental Assessment and Finding of No Significant Impact
Rights: Approved for Public Release; Distribution is Unlimited
URI: https://hdl.handle.net/11681/37254
Appears in Collections:Environmental Documents

Files in This Item:
File Description SizeFormat 
Final_EA_Eagle_Island_Dike_Raise_4_Apr_2017.pdf28.33 MBAdobe PDFThumbnail
View/Open