Please use this identifier to cite or link to this item: https://hdl.handle.net/11681/37034
Title: Environmental Assessment : Dorchester Reach Water Transmission Main, Dorchester County, South Carolina
Authors: United States. Army. Corps of Engineers. Charleston District.
Keywords: Water-supply engineering
Dorchester County (S.C.)
Environmental protection
Environmental management
Publisher: United States. Army. Corps of Engineers. Charleston District.
Abstract: This Environmental Assessment has been prepared by the U.S. Army Corps of Engineers, Charleston District in compliance with the National Environmental Policy Act, 42 U.S.C. §§ 4321- 4370f, and its implementing regulations, 40 C.F.R. §§ 1500-1508, and 33 C.F.R. Part 230, to evaluate the proposed installation and operation of a potable water transmission main from Harleysville, SC to near Ridgeville, SC.
Description: Environmental Assessment and Finding of No Significant Impact
Rights: Approved for Public Release; Distribution is Unlimited
URI: https://hdl.handle.net/11681/37034
Size: 54 pages / 2.57 MB
Types of Materials: PDF/A
Appears in Collections:Environmental Documents

Files in This Item:
File Description SizeFormat 
Final Dorchester Reach FONSI and EA .pdf2.57 MBAdobe PDFThumbnail
View/Open