Please use this identifier to cite or link to this item: https://hdl.handle.net/11681/37013
Title: Supplemental Environmental Assessment : Savannah Harbor Expansion Project, Modification of McCoys Cut Feature (McCoys Cut), Chatham County, Georgia and Jasper County, South Carolina
Authors: United States. Army. Corps of Engineers. Savannah District.
Keywords: Savannah Harbor (Ga.)
Savannah River (Ga. and S.C.)
Environmental protection
Environmental management
Publisher: United States. Army. Corps of Engineers. Savannah District.
Abstract: The U.S. Army Corps of Engineers, Savannah District, prepared this Supplemental Environmental Assessment to evaluate proposed changes to the McCoys Cut flow re-routing feature of the Savannah Harbor Expansion Project. This SEA supplements the July 2012 Final Environmental Impact Statement for the SHEP and Record of Decision dated October 26, 2012. The FEIS and ROD are incorporated herein by reference. These 2012 documents and the General Reevaluation Report (GRR) can be found at: http://www.sas.usace.army.mil/Missions/Civil-Works/Savannah-Harbor-Expansion . The proposed action would extend the dredging area within Middle River to ensure sufficient freshwater flow to intended areas, as well as save space in the upland DMCA sites by reusing some of the dredged sediments. The reused sediments would create wetland habitat rather than going into approved upland DMCA sites.
Description: Supplemental Environmental Assessment and Finding of No Significant Impact
Rights: Approved for Public Release; Distribution is Unlimited
URI: https://hdl.handle.net/11681/37013
Size: 258 pages / 12.95 MB
Types of Materials: PDF
Appears in Collections:Environmental Documents

Files in This Item:
File Description SizeFormat 
McCoysCut_Supplemental_Environmental_AssessmentandFONSI.pdf12.95 MBAdobe PDFThumbnail
View/Open