Please use this identifier to cite or link to this item:
https://hdl.handle.net/11681/36358
Title: | Grand Prairie Region and Bayou Meto Basin, Arkansas Project : Bayou Meto Basin, Arkansas, General Reevaluation Report, Volume 5 : Appendix B, Engineering Investigations & Analyses, Agricultural and Water Supply Component, Section III - Civil Design, Section IV - Structural, Electrical & Mechanical, Section V - Pumping Stations, Section VI - Relocations, Section VII - Geospatial, Section VIII - Survey |
Authors: | United States. Army. Corps of Engineers. Memphis District. |
Keywords: | Bayou Meto (Ark.) Wetlands Agriculture Flood control Environmental management Environmental protection |
Publisher: | United States. Army. Corps of Engineers. Memphis District. |
Abstract: | This section presents the basic criteria for the design of the irrigation structures identified in the Bayou Meto Basin Project feasibility phase. Approval of this GRR will become the basis for initiation of the Design Document Report and plans and specifications for the various structures in this section. Sufficient engineering and design was performed to enable refinement of the project features and prepare the baseline cost estimate. Except for drop structures and weirs, the structural components and configurations of the support structures were adopted from the final design documentation of the Grand Prairie Area Demonstration Project. |
Description: | General Reevaluation Report |
Rights: | Approved for Public Release; Distribution is Unlimited |
URI: | https://hdl.handle.net/11681/36358 |
Size: | 249 pages / 13.42 Mb |
Types of Materials: | PDF/A |
Appears in Collections: | Environmental Documents |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
Bayou Meto Basin-GRR Volume 5_2007.pdf | 13.42 MB | Adobe PDF | ![]() View/Open |