Please use this identifier to cite or link to this item:
https://hdl.handle.net/11681/35395
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.author | United States. Army. Corps of Engineers. New Orleans District. | - |
dc.date.accessioned | 2020-02-03T16:45:29Z | - |
dc.date.available | 2020-02-03T16:45:29Z | - |
dc.date.issued | 2009-03 | - |
dc.identifier.uri | https://hdl.handle.net/11681/35395 | - |
dc.description | Supplemental Environmental Impact Statement | - |
dc.description.abstract | The existing Inner Harbor Navigation Canal (IHNC) Lock was completed in 1923; is 640 feet long, 75 feet wide, and 31.5 feet deep; and connects the Mississippi River with the IHNC, Gulf Intracoastal Waterway and Mississippi River – Gulf Outlet. Because of maintenance issues and its relatively small size, the IHNC Lock is subject to closures and congestion, leading to long delays for waterborne traffic. A total of eight sites for a new lock have been evaluated through planning efforts and public involvement beginning in 1960. A 1997 Environmental Impact Statement was prepared and evaluated two action plans in detail. In 2007, the Federal District Court, Eastern New Orleans District enjoined the project and required the preparation of a Supplemental EIS to describe changes in existing conditions after Hurricane Katrina and to analyze impacts from the recommended plan and alternatives on these existing conditions. The 1997 EIS Plan, and two revised lock replacement plans, the Cast in Place and Float in Place plans as well as a No-build/Deauthorization Plan are evaluated. The 1997 EIS Plan would replace the existing lock with a new 110-foot wide, 1,200-foot long and 36-foot deep lock in the IHNC north of the Claiborne Avenue Bridge and extend Mississippi River floodwalls and levees from the existing lock to the new lock location. The 1997 EIS Plan includes the replacement of the existing St. Claude Avenue Bridge with a low-level double-bascule bridge and modifications to the North Claiborne Avenue Bridge to make it compatible with a new lock. The 1997 EIS Plan would construct lock monoliths at an off-site construction area and dispose of material dredged during lock construction. The lock design and location, and bridge modifications in the Cast-in-place Plan would be similar to the 1997 Plan, except the Cast-in-place Plan would construct seven lock monoliths founded on piles within a cellular sheet pile cofferdam, instead of floating lock monoliths to the new lock site. The Float-in-place Plan, which is the recommended plan, is very similar to the 1997 EIS Plan. The Float-in-place Plan requires two separate construction locations, the off-site construction area and new lock site. The off-site construction area would allow for lock module construction in dry conditions. Lock modules would be floated to the lock construction site in the IHNC. Additional evaluation has further refined the location and design of the confined disposal facility for contaminated dredged material, the location and size of the off-site construction area, and the methods for disposal of all dredged material, including an option for disposal of contaminated dredged material in a Type I landfill. Although project modifications have been made to minimize socioeconomic and noise impacts and alterations to traffic patterns during the lock and bridge construction, short-term adverse impacts are anticipated to housing, business and industrial activity, community services, tax revenues, and vehicle transportation. Additionally, long-term adverse impacts would occur on aesthetics and recreational resources from the IHNC Lock Replacement project due to the modification of levees and floodwalls. Although the demographics of nearby neighborhoods have changed dramatically due to Hurricane Katrina, a community impact mitigation plan was implemented as part of the 1997 EIS Plan and would continue to provide $43 million in funding for numerous projects to avoid, minimize and compensate for adverse impacts on socioeconomic resources in the nearby neighborhoods. | en_US |
dc.format.extent | 222 pages / 9.467 Mb | - |
dc.format.medium | PDF/A | - |
dc.language.iso | en_US | en_US |
dc.publisher | United States. Army. Corps of Engineers. New Orleans District. | en_US |
dc.rights | Approved for Public Release; Distribution is Unlimited | - |
dc.source | This Digital Resource was created in Microsoft Word and Adobe Acrobat | - |
dc.subject | Inland navigation | en_US |
dc.subject | Inner Harbor Navigation Canal (La.) | en_US |
dc.subject | Locks (Hydraulic engineering) | en_US |
dc.subject | Environmental management | en_US |
dc.title | Supplemental Environmental Impact Statement : Inner Harbor Canal Lock Replacement Project, Orleans Parish, Louisiana | en_US |
dc.type | Report | en_US |
Appears in Collections: | Environmental Documents |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
SEIS Inner Harbor Navigation Canal Lock Replacement Project_2009.pdf | 9.69 MB | Adobe PDF | ![]() View/Open |