Please use this identifier to cite or link to this item:
https://hdl.handle.net/11681/35154
Title: | Mississippi River Ship Channel, Gulf to Baton Rouge, LA: Integrated General Reevalution Report & Supplement III to the Final Environmental Impact Statement, Mississippi River Ship Channel, Baton Rouge to the Gulf, Louisiana Project: Appendix L, References |
Authors: | United States. Army. Corps of Engineers. Mississippi Valley Division. |
Keywords: | Mississippi River Louisiana Channels (Hydraulic engineering) Inland navigation Environmental management |
Publisher: | United States. Army. Corps of Engineers. New Orleans District. |
Abstract: | This appendix contains references for the document "Mississippi River Ship Channel, Gulf to Baton Rouge, LA: Integrated General Reevalution Report & Supplement III to the Final Environmental Impact Statement, Mississippi River Ship Channel, Baton Rouge to the Gulf, Louisiana Project:" |
Description: | Integrated General Reevaluation Report and Supplemental Environmental Impact Statement |
Rights: | Approved for Public Release; Distribution is Unlimited |
URI: | https://hdl.handle.net/11681/35154 |
Size: | 35 pages / 590.4 Kb |
Types of Materials: | PDF/A |
Appears in Collections: | Environmental Documents |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
MRSC_Appendix L.pdf | 590.44 kB | Adobe PDF | ![]() View/Open |