Please use this identifier to cite or link to this item: https://hdl.handle.net/11681/35035
Title: Mississippi River Ship Channel, Gulf to Baton Rouge, LA: Integrated General Reevalution Report & Supplement III to the Final Environmental Impact Statement, Mississippi River Ship Channel, Baton Rouge to the Gulf, Louisiana Project: Appendix C, Engineering Report
Authors: United States. Army. Corps of Engineers. Mississippi Valley Division.
Keywords: Mississippi River
Louisiana
Channels (Hydraulic engineering)
Inland navigation
Environmental management
Publisher: United States. Army. Corps of Engineers. New Orleans District.
Abstract: The Engineering Appendix presents and documents the feasibility level engineering and design for the Recommended Plan. Development of the Engineering Appendix was in accordance with Engineering Regulation 1110-2-1150, "Engineering and Design for Civil Works Projects", dated 31 August 1999. The comparative studies of alternatives, field investigations, designs, and costs estimates presented herein are in sufficient detail to substantiate the Recommended Plan and baseline estimate.
Description: Integrated General Reevaluation Report and Supplemental Environmental Impact Statement
Rights: Approved for Public Release; Distribution is Unlimited
URI: https://hdl.handle.net/11681/35035
Size: 40 pages / 2.009 Mb
Types of Materials: PDF/A
Appears in Collections:Environmental Documents

Files in This Item:
File Description SizeFormat 
MRSC_Appendix C.pdf2.06 MBAdobe PDFThumbnail
View/Open