Please use this identifier to cite or link to this item: https://hdl.handle.net/11681/35034
Full metadata record
DC FieldValueLanguage
dc.contributor.authorUnited States. Army. Corps of Engineers. Mississippi Valley Division.-
dc.date.accessioned2019-12-27T16:19:46Z-
dc.date.available2019-12-27T16:19:46Z-
dc.date.issued2018-04-
dc.identifier.urihttps://hdl.handle.net/11681/35034-
dc.descriptionIntegrated General Reevaluation Report and Supplemental Environmental Impact Statement-
dc.description.abstractThe purpose of this Real Estate Plan is to address real estate issues associated with acquisition of real estate interests to construct the project evaluated in this General Reevaluation Report. The first two phases of the project have been completed; Phase I was completed in December 1987 and Phase II was completed in December 1994. The plan of action that was initially conceived, immediately after authorization, provided that Phase 3 of the Project would construct the Project navigation channel to the fully authorized depth of 55 feet from the Gulf of Mexico through the Port of Baton Rouge, Louisiana. However, due to constraints that result from the non-Federal sponsor’s desire to limit its responsibilities for OMRR&R, this General Reevaluation Report is examining only those reasonable alternatives that propose construction of the navigation channel up to a depth of 50 feet. The information contained herein is for planning purposes and may be subject to change as project design is refined during Project Engineering Design. A draft REP was prepared in November 2016 in support of the draft GRR. This Final REP incorporates information from a more detailed feasibility analysis, which includes a change to the Recommended Plan (from the plan that was presented in the draft GRR as the Tentatively Selected Plan (TSP)), analysis of training works, refinement of utility relocations, additional hydraulic modeling, as well as, resolution of comments received from both the public and other agency reviews, the Agency Technical Review, Independent External Peer Review, and review by the Vertical Team. The REP was written to the same level of detail as the GRR it supports.en_US
dc.format28 pages / 5.035 Mb-
dc.format.mediumPDF/A-
dc.language.isoen_USen_US
dc.publisherUnited States. Army. Corps of Engineers. New Orleans District.en_US
dc.rightsApproved for Public Release; Distribution is Unlimited-
dc.sourceThis Digital Resource was created in Microsoft Word and Adobe Acrobat-
dc.subjectMississippi Riveren_US
dc.subjectLouisianaen_US
dc.subjectChannels (Hydraulic engineering)en_US
dc.subjectInland navigationen_US
dc.subjectEnvironmental managementen_US
dc.titleMississippi River Ship Channel, Gulf to Baton Rouge, LA: Integrated General Reevalution Report & Supplement III to the Final Environmental Impact Statement, Mississippi River Ship Channel, Baton Rouge to the Gulf, Louisiana Project: Appendix B, Real Estate Planen_US
dc.typeReporten_US
Appears in Collections:Environmental Documents

Files in This Item:
File Description SizeFormat 
MRSC_Appendix B.pdf5.16 MBAdobe PDFThumbnail
View/Open