Please use this identifier to cite or link to this item:
https://hdl.handle.net/11681/34997
Title: | West Shore Lake Pontchartrain Hurricane and Storm Damage Risk Reduction Study: Final Integrated Feasbility Report and Environmental Impact Statement: Appendix G, Value Engineering |
Authors: | United States. Army. Corps of Engineers. Mississippi Valley Division. |
Keywords: | Pontchartrain, Lake (La.) Flood control Hurricanes Environmental management |
Publisher: | United States. Army. Corps of Engineers. New Orleans District. |
Abstract: | This report documents Feasibility Phase Value Engineering application to this project. It serves as an update supplemental to a previous VE study (CEMVN-VE-00-10) that was performed in 2000, early in the planning phase. That study has exceeded its allowable 6-year viability per ER 11-1-321 and must be updated per this document. In conducting this update, project functions, current issues as well as pertinent recommendations from the previous VE workshop were considered and documented below. As a result of this review several original and new VE recommendations are presented as Appendix A, and should be further considered in further project development. |
Description: | Integrated Feasibility Report and Environmental Impact Statement |
Rights: | Approved for Public Release; Distribution is Unlimited |
URI: | https://hdl.handle.net/11681/34997 |
Size: | 49 pages / 5.145 Mb |
Types of Materials: | PDF/A |
Appears in Collections: | Environmental Documents |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
West Shore Lake Pontchartrain Hurricane & Storm Damage RRS_2014 Appendix G.pdf | 5.27 MB | Adobe PDF | ![]() View/Open |