Please use this identifier to cite or link to this item:
https://hdl.handle.net/11681/34976
Title: | West Shore Lake Pontchartrain Hurricane and Storm Damage Risk Reduction Study: Final Integrated Feasbility Report and Environmental Impact Statement: Appendix E, Plan Formulation |
Authors: | United States. Army. Corps of Engineers. Mississippi Valley Division. |
Keywords: | Pontchartrain, Lake (La.) Flood control Hurricanes Environmental management |
Publisher: | United States. Army. Corps of Engineers. New Orleans District. |
Abstract: | This appendix provides supplemental plan formulation information on the West Shore Lake Pontchartrain, Louisiana Hurricane and Storm Damage Risk Reduction Feasibility study. It supplements the information in Chapter 3 of the main report and includes tables and maps used in the development, screening, and valuation of management measures and alternative plans. Per the study authority, as identified in Chapter 1, the study area includes portions of St. Charles, St. John the Baptist, and St. James Parishes. It is bounded on the east by the Bonnet Carré Spillway upper guide levee, on the north by Lakes Pontchartrain and Maurepas, on the west by the Ascension/St. James Parish line, and on the south by the Mississippi River Levee. |
Description: | Integrated Feasibility Study and Environmental Impact Statement |
Rights: | Approved for Public Release; Distribution is Unlimited |
URI: | https://hdl.handle.net/11681/34976 |
Size: | 31 pages / 5.184 Mb |
Types of Materials: | PDF/A |
Appears in Collections: | Environmental Documents |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
West Shore Lake Pontchartrain Hurricane & Storm Damage RRS_2014 Appendix E.pdf | 5.31 MB | Adobe PDF | ![]() View/Open |